Laserfiche WebLink
• Specification No . : RGS0024-87 <br /> PART II - SPECIFIC CONDITIONS <br /> Section 4 - Procedures and <br /> Controls <br /> 4 . 8. 1 . 7 Coordinate enclosure (covering ) of work with required <br /> inspections and tests so as to minimize necessity of <br /> uncovering work for the purpose . Give a minimum of 48 <br /> hours ' notice . <br /> 4. 8 . 1 . 8 Mounting Heights : Where mounting heights are not <br /> indicated , mount individual units of work at industry- <br /> recognized standard mounting heights for applications <br /> indicated . Refer to questionable mounting height <br /> choices to Architect/Engineer for final descision. <br /> 4 . 8 . 1 . 9 General : Do not cut--and-parch structural work in a <br /> manner resulting in reduction of load-carrying capacity <br /> or load-deflection ration ; submit proposed cutting and <br /> patching to Engineer for structural approval before <br /> proceeding . Do not cut-and- patch operational elements <br /> and safety related components in manner intended or <br /> resulting in decreased operational life , increased <br /> maintenance , or decreased safety . Remove and replace <br /> work judged by Engineer to be cut-and-patched in a <br /> visually unsatisfactory or otherwise objectionable <br /> manner . <br /> 4 . 8. 2 Cleaning and Protection : <br /> 4 . 8 . 2 . 1 General : During handling and installation of work at <br /> project site , clean and protect work in progress and <br /> adjoining work on a basis of perpetual maintenance . <br /> Apply suitable protective covering of newly installed <br /> work where reasonably required to ensure freedom from <br /> damage or deterioration at time of substantial <br /> completion; otherwise , clean and perform maintenance on <br /> newly installed work as frequently as necessary through <br /> remainder of construction period . Adjust and lubricate <br /> operable components to ensure operability without <br /> damaging effects . <br /> 4 . 8 . 2. 2 Limiting Exposures of Work : To extent possible through <br /> reasonable control and protection methods , supervise <br /> performance of work in a manner and by means which will <br /> ensure that none of the work , whether completed or in <br /> progress , will be subjected to harmful , dangerous , <br /> damaging , or otherwise deleterious exposures during <br /> construction period . Such exposures include (where <br /> applicable , but not by way of limitation) static <br /> IV-4 <br />