My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No. : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 9 - Specific Conditions <br /> for Tank Installation <br /> SECTION 9 - SPECIFIC CONDITIONS FOR TANK INSTALLATION <br /> 9 . 0 This section describes tank and equipment installation. <br /> 9 . 1 Related Documents : <br /> Project plans and general provisions of the Pacific Gas and <br /> Electric Company apply to work of this section. <br /> 9 . 2 Outline of Work : <br /> Work performed under this section shall consist of all. <br /> activities , improvements , repairs , and other associated work <br /> and the furnishing of all labor , materials , equipment and <br /> services necessary whether or not specified herein and <br /> reasonably incidental to install : <br /> - One concrete contained steel sump . <br /> - One 2 , 000 gallon double walled fiberglass coated steel <br /> transformer oil tank. <br /> Together with appurtenant equipment including but not limited to : <br /> - Piping and Electrical Connection <br /> - Vents and Valving <br /> - Leak Detector <br /> - High Level Indicator <br /> - Tank Holddown Slab <br /> - Precision Leak Tests <br /> - Concrete Paving <br /> - Asphalt Paving <br /> 9 . 3 Job Conditions : <br /> 9 . 3 . 1 Examine all drawings inspect the site and be familiar with <br /> the required work.. <br /> 9 . 3 . 2 Obtain and pay for local permits and authorizations <br /> necessary for the work , excluding those obtained by <br /> Engineer , i . e . , building , fire , and health district <br /> permits . <br /> IX-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.