Laserfiche WebLink
Specification No. : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 9 - Specific Conditions <br /> for Tank Installation <br /> SECTION 9 - SPECIFIC CONDITIONS FOR TANK INSTALLATION <br /> 9 . 0 This section describes tank and equipment installation. <br /> 9 . 1 Related Documents : <br /> Project plans and general provisions of the Pacific Gas and <br /> Electric Company apply to work of this section. <br /> 9 . 2 Outline of Work : <br /> Work performed under this section shall consist of all. <br /> activities , improvements , repairs , and other associated work <br /> and the furnishing of all labor , materials , equipment and <br /> services necessary whether or not specified herein and <br /> reasonably incidental to install : <br /> - One concrete contained steel sump . <br /> - One 2 , 000 gallon double walled fiberglass coated steel <br /> transformer oil tank. <br /> Together with appurtenant equipment including but not limited to : <br /> - Piping and Electrical Connection <br /> - Vents and Valving <br /> - Leak Detector <br /> - High Level Indicator <br /> - Tank Holddown Slab <br /> - Precision Leak Tests <br /> - Concrete Paving <br /> - Asphalt Paving <br /> 9 . 3 Job Conditions : <br /> 9 . 3 . 1 Examine all drawings inspect the site and be familiar with <br /> the required work.. <br /> 9 . 3 . 2 Obtain and pay for local permits and authorizations <br /> necessary for the work , excluding those obtained by <br /> Engineer , i . e . , building , fire , and health district <br /> permits . <br /> IX-1 <br />