Laserfiche WebLink
r <br /> Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 9 - Specific Conditions <br /> for Tank Installation <br /> 9 . 6 Part 3 - Execution <br /> 9 . 6 . 1 After a contract is awarded , if minor changes or additions <br /> are required by the aforementioned authorities , even <br /> though such work is not shown on drawings or covered in <br /> this specification , they must be included at the <br /> Contractor ' s expense . <br /> 9 . 6. 2 Contractor shall arrange for all required inspections of <br /> governing jurisdictions . The exact locations of <br /> apparatus , equipment and piping shall be ascertained from <br /> Engineer or his representative in the field and work shall <br /> be laid out accordingly . Should the Contractor fail to <br /> ascertain such locations , the work shall be changed at his <br /> own expense when so ordered by Engineer . Engineer <br /> reserves the right to make minor changes in the location <br /> of piping and equipment up to the time of installation <br /> without additional cost . <br /> 9 . 6 . 3 Drawings : It is the intention of the drawings and <br /> specifications that where certain mechanical items such as <br /> unions , expansion joints and other mechanical components <br /> are not shown but where such items are required by the <br /> nature of the work, they shall be furnished and installed . <br /> 9 . 6 . 4 The mechanical drawings and specifications are intended to <br /> supplement each other . Any-materials or labor called for <br /> in one shall be furnished even though not specifically <br /> mentioned in the other . <br /> Sizes shown are the minimum allowable , and shall be <br /> increased in size if required by Code or wherever ` <br /> necessary to meet unusual conditions . <br /> 9 . 7 Installation : <br /> 9 . 7 . 1 Contractor shall install all materials in accordance with <br /> plans and specifications , manufacturer ' s recommendations <br /> and standards and codes of governing jurisdictions . <br /> 9 . 7 . 2 For all directional changes in product , vapor or vent <br /> lines , a swing joint shall be installed consisting of two <br /> 90° galvanized elbows with short nipple . <br /> IX-4 <br />