My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
REMOVAL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:47:59 PM
Creation date
11/7/2018 10:21:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 REMOVAL .PDF
QuestysFileName
1987 REMOVAL
QuestysRecordDate
8/2/2018 9:28:19 PM
QuestysRecordID
3954039
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> UNDERGROUND STORAGE TANK CLOSURE PLAN <br /> FOR <br /> PACIFIC GAS AND ELECTRIC COMPANY'S <br /> STOCKTON SERVICE CENTER <br /> 1. Location: Stockton Service Center, 4040 West Lane, Stockton, <br /> California. Phone # (209 ) 942-1447. <br /> Contact: Mr. Fred Wright <br /> 2. Physical Description: 6/A�- 250 gallon, steel, with associated <br /> piping. <br /> 1 - 10 , 000 gallon , steel , with <br /> associated pumps , sump , and <br /> piping. <br /> v <br /> 3. Contents : None . The 250 gallon4strage tanks contained <br /> waste oil and hydraulic oil. <br /> The 10, 000 gallon storage tank contained transformer oil. <br /> 4. Contractor: SO 5 2✓ erv'\Acj'/1a-J <br /> 5 . Soil Sampling : The soil sampling and testing will be <br /> performed by The Twining Laboratories, Inc. <br /> 6. Methods of Disposal : Before excavation begins, any residual <br /> sludge or free liquid will be removed from the tanks with a <br /> vacuum truck. Clean excavated material will be stockpiled <br /> on-site for use in backfilling the excavation. The tanks and <br /> piping will then be uncovered with a backhoe . The piping <br /> will be removed and stockpiled for off-site disposal. <br /> Flammable vapors will be purged by introducing 1. 5 pounds of <br /> dry ice per 100 gallons of capacity into each tank and <br /> sealing all openings, except the vent port, at least one hour <br /> before tank removal . Following removal , the tanks will be <br /> removed from the site as soon as possible by licensed <br /> hazardous waste hauler and transported directly to a Class I <br /> disposal facility. AQy be G/eane6�1, an SiJ-p v re"Clere'l / h <br /> Any obvious contaminated soils will be excavated and <br /> stockpiled for off-site disposal . Soil samples will then be <br /> taken from the bottom of the excavation and laboratory tested <br /> for oil, grease , and polychlorinated biphenyuls ( PCB ) . At <br /> least one sample will be taken for each 200 square foot of <br /> tank excavation and for each 20 linear foot of piping <br /> excavation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.