Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 <br /> Rnl. <br /> TYPE OF ACTION ❑ 1.NEW PLAN (3 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# Llgeney Use Only) _ <br /> BUSINESS NAME(Same as FACILITY NAME) Rn+-. <br /> BUSINESS SITE ADDRESS am. LgTy Rw. <br /> U. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Mater <br /> Business Plan. ials <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop anv release(e.g.,activate pump shuPofl;etc.)and.if necessary,safely remove <br /> remaining hazardous material foram.UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the abilitv of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is an longer intended for use will be managed as hazardous waste unless a waste determination m accordance with 22 CCR§66262.1 I Finds that <br /> ais non-hazardous. Used absorbent material,reusable or waste, will be stored in a properly labeled and sealed container Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any later removed from secondary containment systems,or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(ie_rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary <br /> 3. Hazardous material, other than the pmduct/waste stored in the primary containment system, is placed inside secondary comairun nntato�at or neutralize <br /> released pmduct(waste,and the added material or resulting material from such a combination is not compatible with secondary containment <br /> III- SPILL CONTROL AND CLEAN—UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill comm)and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed Defective equipment is repaired or replaced m necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUTAVADABLE FOR USE6NEEDED: (Cam lete tent ifa licable) <br /> EQUIPMENT LOCATION - AVAILABILITY <br /> RIO Mo <br /> R]n. <br /> all. <br /> R21. R31. <br /> R12 R2Z <br /> R32. <br /> R13. R2 <br /> R13. <br /> R1A. R 1 <br /> R39. <br /> RIS. R2 <br /> 165. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANT WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME RN'. TITLE <br /> NAME .5' <br /> O:vrL�.r <br /> R91TITLE Rri <br /> NAME R1 TITLE <br /> RSA <br /> NAME R13 <br /> TITLE A53 <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAJKHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 0 Additional system testing or data collection Cil'ImpIcclion by qualified persons 0 Recalibration of <br /> Other: equipment <br /> Rso <br /> UST Resonnse Plan(3/21108)-1/3 <br />