Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI.DISPENSER MONITORING <br /> 6{ONITORMG OF AREAS BENEATH DISPENSERS)IS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> fI`('I' 1.CONTINUOUS ELECTRONIC MONff�ING O UNDER SPENSfXt CONTAINMENT(IJDC) Mvl <br /> PANEL MANUFACTURER: _/z'� ��" �U - 1. <br /> LEAK SENSOR MANUFACTURER: MODEL#:__ LS -3 15n Ms?. <br /> J/i���Y M;3. MODEL#(SY.Z92,_-le I � MM. <br /> WLLL DETECTION OF A LEAK INTO THE UDC TRIGGER ADDIBLE AND VISUAL ALARMS? <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATTC PUMP SHUTDOWN? (ig-a-YES ❑ b.NO �'- <br /> WLLL FAILURE/DISCONNECITON OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMPS _ <br /> Pa.YES ❑ b.NO mm <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASP ODFOWN9 -61 a YES ❑ b.NO "t5t. <br /> ASSEMBLY MANUFALEAK <br /> CTURER- Mss <br /> ❑ 3.VISUAL MONITORING DONE: MODEL#(S): M59. <br /> [3 4.NO DDISPENSERS ❑ a.DAILY ❑ b.WEEKLY ia�gm.o uymq- WO <br /> ❑ 99.OTHER(Specify) <br /> M61. <br /> VII. ENHANCED LEAK DETECTION <br /> r[I <br /> IMPLEMENT ENHANCED LEAK MroD EVERY 36 MONTHS AS REQUIRED <br /> ORING PLAN(Required) MauPERATING MANUALIFORNIAUNDERGROUND STORAGE TANK LASTATISTICAL ATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> WRCB PUBLICATION:-WEORY EKLY RECONCILIATION" <br /> GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed81 <br /> By January 1,2005 this facility will have a"Designated UST Opemml'who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and <br /> This training will include,but is not limited to,the following: maintenance of the UST systems. <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and oveMls. <br /> Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005 the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDPTIONAL INF RMATION J <br /> Please use this section t�'�dude any additioual�U;T System mortitOdng-felaltd infoHnaf e.g.,add oral information re aired by you local a ncy): <br /> /aro T1_71 /moi l� cr�;?"// 1v, CTR T/a <br /> D� k Uf/u�re. <br /> AS OF 1/1/05, THE"DESIGNATED UST OPERATOR"IDENTIFIED IN SX- PERSONNEL ECTION ru uk rHE CRJg TS UST OPERATING PERMIT APPLICATION- <br /> FACII-ITY FIRM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DEFECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VIIN <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR 4 2715(b). SUAL SPECTIONS OF THE FACII.ITY'S <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CER AT1ON• certify rinatioa provided herein is true and accurate to the best of <br /> O OPm knowledge. <br /> ERA SIGN REPRE ENTING DATE: <br /> MYI. <br /> Wrier MNr <br /> ❑Dpefaldf <br /> 0 R/OPERATO/R�NAME(print): NW- <br /> 0 PERATOR TITLE: <br /> M93. <br /> 4� <br /> fAgenry Use Orn1YJ This P�' eet�~ �pproved ❑Approved With Conditions Disappmved <br /> Local Agency Signature: <br /> Date: ) 7i'r <br /> Comments/Special Con / <br /> SJCEHD-d(07103)-3/4 <br /> MM/03 <br />