Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> �i Tanlvxobgy <br /> 8900 SHOAL CREEK,BUILDING 200 <br /> TEST DATE: 05/10/99 AUSTIN,TEXAS 78757(512)451.6334 WORK ORDER NUMBER: 2208540 <br /> CLIENT: CHEVRON, U.S.A. SITE: CHEVRON 200764 <br /> .:TANKINFORMATION{'< <br /> Tank ID: 87 3 Tank manifolded: NO Bottom to top fill in inches: <br /> Product: REG UNLF.AD Vent manifolded: No Bottom to grade in inches: <br /> Capacity in gallons: Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST RESULTS- :,Test Method:VPLT ': '.0 .K DETECTOR TEST RESULTS, Test method: FTA <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.rig <br /> UFT/OFT: Make: VEEDERROOT <br /> Fluid volume in gallons: Model: L.L.D. <br /> Tank water level in inches: S/N: <br /> Test time: NOT Open time in sec: <br /> Number of thermisters: TESTED Holding psi: NOT <br /> Specific gravity: Resiliency cc: TESTED <br /> Water table depth in inches: Test leak rate mVm: 189.0 <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTest Method:.UTS-4T LINE TEST RESULTS Test type: PTX-8e <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length (ft): 200.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> Test time <br /> DATA FOR UTS-4T ONLY: t time:: <br /> me <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: <br /> Test 2:Start time: TESTED TESTED TESTED TESTED <br /> Flow rate (cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate (cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate (cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: UNXNOWN <br /> Draft 06/02/1999 15:29 MSHAW <br />