Laserfiche WebLink
WTanknalbgy Test Date: 04/022002 <br /> SECONDARY CONTAINMENT TEST RESULTS Work Order: 2221780 <br /> SUMP TESTS <br /> T e tanker Lisp Model or Diam.�dth/Length ept tart Initial Level Finish Final awl <br /> yp # Manufacturer Material (") (•) Test Method Time Level Change Time Result Fail <br /> STP Sump SUPREME Owens Corning Fiberglass 48" 67" Hydrostatic-VPLT 1346 75 gals • 0.00001 1416 0.000 gph Pass <br /> STP Sump PLUS Owens Corning Fiberglass 48" 68" Hydrostatic-VPLT 1330 75 gals 0.088565 1334 1.383 gph Fail <br /> STP Sump REGULAR Owens Corning Fiberglass W. 68" Hydmstatic-VPLT 1320 75 gals 0.039765 1323 0.621 gph Fail <br /> Dispenser Pan 1/2 Bravo Fiberglass 20" 27" Hydmstatic-VPLT 1420 2" 0.000085 1436 0.002 gph Pass <br /> Dispenser Pan 3/4 Bravo Fiberglass 20" 27" Hydrostatic-VPIT 1432 2" 0.00002 1448 0.000 gph Pass <br /> Dispenser Pan 5/6 Bravo Fiberglass 20" 27" Hydmstatio-VPLT 1530 2" 0.00003 1546 0.000 gph Pass . <br /> Dispenser Pan 7/8 Bravo Fiberglass 20" 27" Hydrostatic-VPLT 1526 2" " 0.00022 1543 0.005 gph Pass <br /> Comments:Regular/Plus sumps failed.Possibly due to the riser attachments to the tank collars,or around the product line penetrations. <br />