My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
2300 - Underground Storage Tank Program
>
PR0232482
>
COMPLIANCE INFO_1993 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:47 PM
Creation date
11/7/2018 10:23:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2003
RECORD_ID
PR0232482
PE
2361
FACILITY_ID
FA0003719
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4747\PR0232482\COMPLIANCE INFO 1993-2003.PDF
QuestysFileName
COMPLIANCE INFO 1993-2003
QuestysRecordDate
1/23/2018 8:03:31 PM
QuestysRecordID
3770094
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irlitoring System Certification 9 <br /> Site Address: 4747 WEST LANE Date of Testing/Service: 03/26/2001 <br /> F. In-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to preform leak detection monitoring <br /> Complete the following checklist: <br /> El Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑No' Was the accuracy of system product level readings tested? <br /> ❑Yes FN.• Was accuracy of system water level readings tested? <br /> ❑ Yes ❑No, Were all probes reinstalled properly? <br /> ❑ Yes I ❑No•I Were all items on the equipment manufacturers maintenance checklist completed? <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Complete the following checklist: <br /> or equipment start-up or annual equipment certfication,was a leak simulated to verify LLD performance? <br /> ® Yes ❑No' ❑N/A (Check all that apply)Simulated leak rate:®3 g.p.h❑0.1 g.p.h ❑0.2 g.p.h <br /> ® Yes ❑No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑No' Was the testing apparatus properly calibrated? <br /> ®Yes ®No' ❑WA For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No' ❑NIA For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ®Yes ❑No' ❑WA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected. <br /> Yes No' NIA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test <br /> ®Yes ❑No' ❑wA or electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ❑No' Nere all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.