Laserfiche WebLink
80AftO OF TRUSTEES <br />J.T.. culbaftaon, Pru. <br />Fattish E. Vannuccl, Sac'y. <br />Anlhonalle Van Sofonaan <br />Ef,I Pimenlal <br />Fafn Sugb" <br />0 anlal L. Floras <br />John O. MAGI, M.O. <br />William J. Wada <br />Mary Anna Lova <br />Facility <br />Address <br />• <br />SAN JOA UIN LOCALi-IEALTH DISTRICT <br />SERViNO <br />City of Lodi <br />1601 East Hazalton Avenue, P. O. Box 2009 <br />San Joaquin County <br />City of Escalon <br />Stockton, California 95201 <br />City of Mantas. <br />209/466-6781 <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />Joel Khanna, M.O., M.P.H.. 01alAcl Haallh Office, <br />San Joaquin County <br />San Joaquin County <br />Date of Inspection « --6 _ Inspector <br />MONITORING ALTERNATIVE d7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the ligtfic: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />✓Annual precision test on tank and piping. <br />�ank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />/ withdrawals. <br />V Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />_Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />lS- <br />l / Precision test( s) must be performed by �-7— _ � end results submitted Co [his <br />l office within 30 days of the test. <br />L / Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be me[, contact this office prior to the specified . <br />dale. <br />4/86. LIST 3 <br />