Laserfiche WebLink
001200 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— a e 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING damhtak l° <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490154& <br /> ❑ 4.NO DISPENSERS _ ❑ 99.OTHER(Specify) 49asm <br /> LEAK MONITOR MANUFACTURER90/7 f 490-99. MODELd: ' v 490-96. <br /> LEAK SENSOR MANUFACTURER: E: P„ L.�1 T asr. MODEL M(Sy. 4vo-sa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. (Q a.YES ❑ b.NO 490.59' <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. f& SS <br /> ❑ b.NO490'60FAR.URF/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [Ib.NO 490-6tUDC MONITORING STOPS THE FLAW OF PRODUCT AT THE DISPENSER. YES ❑ b.NO <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-69. <br /> IF DOUBLE WALL. 49-664& <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a YES ❑ b.NO 490-ws. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DMCMN CELDIMUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.Isr cciijs .t <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. L <br /> _?! nvV` 490-66 <br /> ® 490.67 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 49a6R <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(end supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> • h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> DL TRAINING <br /> • Personnel with UST monitoring responsibilities are familiar with all of the folk wing documents relevant to their job duties: 490-69& <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ®THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490699. <br /> ®OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) < 69& <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49a69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49069-6 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND 490-697 <br /> STATISTICAL INVENTORY RECONCILIATION" 4906$ <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br /> 490-69-6. <br /> ❑ OTHER(Specify): 490-6a. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This mining will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified to this UST Monitoring Plan. <br /> D The facility employee's role with regard to spills and overriEs as specified in the facility's UST Response Plan. <br /> > Name(s)of concoct persons)for emergencies and monitoring alarms. <br /> X. COMMEN'T'S/ADDITIONAL INFORMATION <br /> Provide additional comments�e or indicate taw many pageSW With additional information on specific monitoring procedures am attached to this plan. 490.91 <br /> ^O <br /> XI. HEIRSCINNELRESPONSEDIDLITIE6 <br /> The UST Owner/Operator is responsible for ensuring that:1.)the daily/routme UST monitoring activities and maintenance of UST leak demotion equipment covered <br /> Nis plan occurs:2.)all conditions that indicam a possible release ere investigated:aM 3J all monimring recoMs are mainrairred properly. _ <br /> TIES FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND QUIFMENT MAINTENANCE: <br /> NAME: 4907-6. TITLE: �l 49x73. <br /> ' / <br /> NAME: t <br /> 490-74 TITLE: 490-75. <br /> The Designated UST Opemmr shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accumte to the bat of my Imowkd e. <br /> APPLICANT SIGNATURE <br /> E. DATE: J/.7 49an. <br /> REPRESrIN6 I.TSRom,era ectal O,m ).AwaorimlRe rammire otOwna 490. y. <br /> 76. ! t, - O'A/ '� Oq <br /> APPLICANT NAME(print): '190.78' APPLI ANTTITLE: 490.79. <br /> UPCF USI'-D(12/2007) 3/4 www.unideesarg <br />