My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2012-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
BILLING 2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 10:47:40 AM
Creation date
11/7/2018 11:09:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2012-2014
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1250\PR0231299\BILLING 2012-2014.PDF
QuestysFileName
BILLING 2012-2014
QuestysRecordDate
5/24/2018 7:54:21 PM
QuestysRecordID
3905112
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L7 IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN - Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN E 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Spirit Gasoline <br /> BUSINESS SITE ADDRESS 1250 N Wilson Way 103, CITY Stockton 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequencyspecified <br /> _by the equipment manufacturers Instructions or annually,.whichever Is more frequent.Such work must be performed by qualified,personnel.(23.CCR§2632,2634,263s zeal] <br /> .. ........ ........ ..... _._... ...... .... ... ........... ........ <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(S(Specify): 490-3a. <br /> 490-36. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (hoapply) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5, <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: E a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7� MODEL#: TLS-350 490-8. <br /> LEAK.SENSOR MANUFACTURER:_Veeder Root❑ 49a9. _MODEL#(S_)_:_794390-420 490-10. <br /> AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKlSI.[13 CCR§2643] e90-11. <br /> PANEL MANUFACTURER: 49-12. MODEL#: 490-13. <br /> ENJANK PROBE MANUFACTURER: 490'14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> ____.,..PROGRAMMED.TESTS_ .Q a_0.1g_p.h:_-.-.-..,.---__E_b:.0.2--__h. ❑ c.OTHERS ecif : 490-1e. <br /> gP _.._..__._._____(.P __Y) „ 4s0-iv._.__ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 ccR§2646.11 a9a2o. <br /> ____-..__.._..............._....._____...............__,________________..._.._........______..______.._..._._____-__-_____........__.._ <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)g3 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490 23 21. <br /> __..._._____._..___..___.___-____________._-----_______..____ __-_____-___.-.___.-------_________--___________________......___.__..a . <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] <br /> TEST FREQUENCY .El a.ANNUALLY 0 b BIEN_NIALLY F-1c.___OTHER(Specify): 490-24. <br /> ® 99.OTHER(Speclfy) Visual- Moni-torl-n9 Daily 49 ego-26. <br /> 4o-n. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hCaheack ntl <br /> ® 1.CONTINUOUS MONITORING OF PIPF/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 49o-21. <br /> §26361 SECONDARY CONTAINMENT IS: E a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder Root 490'30' MODEL#: TLS-350 490-31, <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490m32. MODEL#(6): 794380-323 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. E a.YES ❑ b.NO 490-34, <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 490.35, <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636) <br /> MLLD MANUFACTURERS):VMI IM3). 490-38. <br /> ___..__ __.........._.._.___________ .._ MODEL#(sp LD2000 _ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 323339, <br /> ELLD MANUFACTURER(S): 49040. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49044. <br /> ❑ 4.PIPE INTEGRITY TESTING. -.________ ______....__._____..__......__________a90<s: <br /> .TEST.FREQUENCY. E a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS(Specify) 49046' <br /> .............. _______ ___________- ( P_Y)_. 49047. <br /> E S.VIS UAL PIPE MONITORING. ----a9a4s- <br /> FREQUENCY: E a.DAILY <br /> ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 49349. <br /> _.___.._____.____________________________-_____________....____--_________------'Allowed for monitodn�ofundvied e_r¢encry_genoator fm�iQgonlyp--FISC 2R815�6 14- <br /> 3 __ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)1 9320. <br /> .._______________-___________---________..........._........________........_____ --------_-------_----_______________________ __7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 90-sl...___ _______ -__.._.. ._. ____.. ......El 99.OTHER(Specify) .._.-.-.-_ ..._...._. 9asi:-53. <br /> UPCF UST-D(12/2007)-1/3 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.