Laserfiche WebLink
Ah <br /> IED PROGRAM CONSOLIDATED FORIM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT(UDC) MONTTORING (Check all <br /> that apply) <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49o-54c <br /> ❑ 4.NO DISPENSERS _ ❑ 99.OTHER(Specify) 490.54b, <br /> LEAK MONITOR MANUFACTURER: 690.55 MODEL#: 496-56. <br /> LEAK SENSOR MANUFACTURER: 49M7' MODEL#(S): 490.59. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 4WD- <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-sa- <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49161. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑ b.NO 49162. <br /> UDC CONSTRUCTION IS: ❑ L SINGLE WALL ❑ 2.DOUBLE WALL 49161, <br /> IF DOUBLE WALL: 49064. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b.NO 491646, <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49165. <br /> LEAK DETECTION(ELDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED,173 ccR gw44.t] <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490'46. <br /> ® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 49067. <br /> VIII, RECORD KEEPING <br /> The following mormoring/maiatenance records are kept for this facility: 49169. <br /> ® a.ALARM(ACS ❑ b.VISUAL INSPECTION RECORDS ® c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d,SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: 491691, <br /> FERENCE DOCUMENTS MAINTAINED AT FACILITYC (Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 491691,, <br /> I� OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 4906%. <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49°691 <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 49"%. <br /> ® STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49169f <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490698. <br /> ❑ OTHER(Specify): 49a69k. <br /> 490691. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This paining will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan, 490.71 <br /> Overfillprevention: Mechanical flow restrictor set at 95%of tank capacity <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;,2;)all conditions that indicate a possible release are investigated;and 3. all monito records are maintained properly. <br /> y. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Dhani Ram Salhan 490 . TITLE:Operator Manager 490-73. <br /> FLAME: Ram Rattan 490-74 TITLE:Worker 490.75, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> RTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> 14 PLICANT SIGNATURE DATE: a9o-n. <br /> moo. Q � 6/27/2011 <br /> RPPRESENTING:❑1.Tack Owner/ atm ❑2.Fxili Owner/ mm 3.Asawrized eenrative orOwna 490-76. <br /> APPLICANT NAME(print): 490-79' APPLICANT TITLE: 491'79' <br /> Dhani Ram Salhan Operator/Manager <br /> UPCF UST-D(12/2007)-3/4 www.uddocs.org - <br />