My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2001-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
BILLING_2001-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 4:21:08 PM
Creation date
11/7/2018 11:13:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2001-2015
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1756\PR0231300\BILLING 2001-2012.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE UFAC I ION ❑ 1.NEW PLAN N 2.CHANGE OF INF'ORMA'TION 4'10 1' <br /> PLAN TYPE 0 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Smne as Facility Name or DBA) 3. <br /> My Mini Mart <br /> BUSINESS SITE ADDRESS 1756 Wilson Way tag CITY Stockton 104. <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency specified <br /> b the a ant manufacturers'instructions,o_r annu_ate,whichever is,more frequent.Such work must he Derformed b�qualified personnel.[23 cCR§2612,2690.z6sR 11-1-11 <br /> MUNIIOIUNG EQUIPMEN I IS SERVICED ❑ I.ANNUALLY ❑ 99.UI HER(Specify): 491.3. <br /> 490.36. <br /> M. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 cert§1632,1694] 4904' <br /> FV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S; = <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5- <br /> WITH <br /> 90-6WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 460'6. <br /> PANEL MANUFACTURER: Incon 49 7. MODEL#: TS-1001 490-8. <br /> LEAK 6FN6QRiviiivuTACTtixER: TSP A00'0- MODEL#(S): STD-101, EIS 19ara <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).In CCR§2643] ago-it. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 49 13. <br /> IN-TANK PROBE MANUFACTURER: 490'14' MODEL#(S): 4W15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490'16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490"17. <br /> PROGRAMMED TESTS:_ 11a.0.1 g.p.h. [Ib.0.2 g.p.h. 11c.OTHER(Specify): 4�119,)e' <br /> ❑ 3._MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 cert§26a6.t1 4x1-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[n cca§261-51 TESTING PERIOD: ❑ a.36 HOURS [Ib.60 HOURS 4W23. <br /> _. .--._..__._ 490-21 <br /> ❑ 5.TANK INTEGRITY TESTING PER[n cert 92W.11 494-23. <br /> TEST FREQUENCY: ® a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify) 491-24. <br /> P�I37 491-25. <br /> ® <br /> 99.OTHER(Specify): Visual Monitoring Daily 49P27X <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "hec" <br /> that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 49o-n. <br /> [§3"cc6R SECONDARY CONTAINMENT IS: 0 a.DRY E] b.LIQUID FILLED 1-1c.PRESSURIZED [Id.UNDER VACUUM 490.M. <br /> PANEL MANUFACTURER:Incon 490'30' MODEL#: TS-1001 4W31. <br /> LEAK SENSOR MANUFACTURER: 132' MODEL#(S): ULS 490-33. <br /> PIPING LEAK ALARM'1'RIQGERS AUI'OMAI'IC PUMP(i.e.,'I URBINE)SHUTDOWN. 0 a. YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> 2..MECHANICAL LINE LEAK DETECTOR(MLID)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF +90-34 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.In cert§26361 <br /> MELD MANUFACTURER(s) Red Jacket 490"37' MODEL#(S): FX-1V iL.0 ZOC)Q 490-38. <br /> ------ <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINIELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] Oxo-39. <br /> ELLD MANUFACTURER(S): 41' MODEL#(S): 490x1. <br /> PROGRAMMED IN LIME LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILUREiD1SCONNrECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 1901-1 <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ® a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49 9900-46' <br /> ® 5.VISUAL PIPE MONITORING-- --- -_-_ 1-9049. <br /> FRFQI TFNCY' ® a DAILY ❑ h WFFKTV ❑ o. MIN MONTHTYRFACHTrmFRYRTF'mnPFRATFD4 491-49- <br /> -A&W04 <br /> 91-49.•A&W04 for T2Wd_ gueimb..d mmg.yR .=a,A.1PipmoftbawxsC§M81.9@ s)�_ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(1X3)] 490'50' <br /> ® 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-31. <br /> _._._ _- <br /> C] 490-f1.99.OTHER(Specify) 49093. <br /> UPCF UST-D(12/2007)-1/4 www.mddO .erg <br />
The URL can be used to link to this page
Your browser does not support the video tag.