My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:50:48 AM
Creation date
11/7/2018 11:13:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1756\PR0231300\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERY ORRVO E GK [9 IL <br /> FiUlLE <br /> VDIVIDUL 9PEGIR <br /> Whether the containment box LL y <br /> is for a new or retrofit dispenser, mom <br /> it is made to spec, with all parts <br /> installed at the factory. "' •' .• ' <br /> Bravo boxes are designed to be <br /> ordered complete 'and ready for <br /> installation. This eliminates <br /> extra charges for additional <br /> parts or high cost labor to •. <br /> ' , f <br /> install them in the field. Bravo's <br /> sturdy steel containers are the <br /> first in the petroleum industry The Patented Shallow Bravo Bax • • <br /> to receive independent third "• • •' <br /> party approval.They are renown WHY A SHALLOW Box DESIGN? - `•• <br /> as contractor-friendly and easy <br /> to install. First, the 7-112" deep box corrosive materials coming in <br /> (measured from island floor contact with the box.Third, the <br /> Each Bravo Box is manufactured to bottom, of the box) helps shallow design allows for easy <br /> � e <br /> under rigorous quality control eliminate a large volume of com- visual inspection and required <br /> and is pretested at the factory bustible matter, thus lessening scheduled pressure tests with- ?••s ` <br /> for safety, reliability and integri- the explosion danger. A deeper out removal of the dispenser. • •• <br /> ty. No box leaves the factory box increases the fuel to oxygen And, fourth, it has more <br /> without passing three separate level and heightens the explosion strength integrity than does a <br /> pressure leak tests. The Bravo risk factor. Second, the shallow deeper box — of prime impor <br /> company's reputation for quality Bravo Box is suspended in con- tance in the event of a collision <br /> and integrity allows it to carry trete — not in direct contact at the island. • • <br /> $2 million product liability with the earthen environment <br /> insurance. This includes beneath the dispenser. So there <br /> pollution and professional is absolutely no possibility of ! ' <br /> protection when the system <br /> 0 <br /> employs exclusiVe use of Arm connected to fusible <br /> link of shear valve shuts <br /> Bravo components. down valve automatically. <br /> tightweibhl float causes positive • • - ' • `�•• <br /> action of shear valve ° •.• , <br /> after leak Of approximately Measured tram • • <br /> islar,d floor to <br /> 6 ounces of product In the boaom til box. • , <br /> s <br /> float reservoir within the 71/2' <br /> dispenser box, . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.