Laserfiche WebLink
19 X Piping (cross-sectional diagram, including connections to tank and dispensers)- <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _ Restricts delivery of flow to tank CSection 2635 (b) (2) (B) or CC)], or <br /> X Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(C)3, or <br /> (B) X Vapor recovery piping designed so it cannot contain Liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)1 <br /> _ Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> _ No valves or pumps installed below grade. <br /> _ inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (p) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> X Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of:_secondary pipe_Vautt or <br /> _lined trench to be sloped to a collection sump at the Low point of the piping. <br /> X Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> _ Lined trench used as secondary containment <br /> _ Material compatible with the substance stored. <br /> _ Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> X Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> X Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: Incon Model: TS-1001/2—P <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> X Annual Line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20, X State Vater Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21 X Plan review and operating permit fees paid. <br /> 40' (Doug Wilson, SJCEH�� <br /> 22. X what is the approximate depth to ground water. <br /> (include source of information - borehole logs, monitoring ueLl data, water <br /> studies, etc.) <br /> 23. X Total number of tanks on site after installation: Two <br /> 24 X XdCXYy/City Fire District and Building Department notified. <br /> 25. - X In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility Cin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHD Size Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name <br /> Title Agent for owner Date 5/12/99 <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />