Laserfiche WebLink
PLASTElkLOELUTRC040 Double-wall <br /> INSTALLATION INSTRUCTIONS Tank <br /> 1. GENERAL_ may set and securely *Achor the ELUTRON" tank ot►the pad <br /> The iv►LAi TEFL'ELUTRC�i'+1* underground tank i. a with a minimum of 6"of backfill between lame bottom centerline <br /> and the pad.Upon local implementing agency approverL you may set <br /> U C.- Listed Jacketed tank providing corrosion protection and 360' and securely rine}tor the ELUTRON' tank directly on the <br /> s:coodary cutitainroent per U.L. 1146 and 58. smooth- flat pad taking care to place a 12" wide x I" thick piece <br /> ELUTRCIN'Ounderground tanks must he installed according of felt between the zntire tfutic bottom ccnterlina and the pad to <br /> to these installation instructions, the latest issue of the Flammable miricnize damage during placement. Consult factory for other <br /> and Combustible Liquids Code, N,'FP.A. 30 for tutdefground tanks anchoring techniques, <br /> and the authority having jurisdiction. <br /> 'Ute installer andlOr owner must read and be familiar with the ��' TESTING <br /> entire installation instructions and Appendix A prior to installing the PRF LiNSTALLATION:Abovegmimd,prior to replaaernent of <br /> ELUT PON' tank. To activate the PLASTEELa tank in excavation,precisely Evilow one of the three testing Options <br /> ELUTV10N'Tank Warrunty-a chmpleoed and signed Certificate cited in Appendix A attad)ed.Do not deviate from these prom shires_ <br /> of Installation for the PLASTE=L'" ELUTR13N'b If the ELUTROW imik is delivered with a vacuum an lie <br /> Underground Tank must be retuned to the m2nufatiurer. For interstice,refer to Caption:l~3 of Appendix A. <br /> additional installation references,consult the current cdltions of: CAUTION: IF OPTION A3 I5 USED, DO NOT APPLY ANY <br /> — Petrolcum Equipment Institute.RP-ID0 PRESSURE TO THE INTERSTICE BEFORE <br /> American Petroleum Insdittte,RP-1615. THOROUGHLY UNDERSTANDING AND FA.rM- <br /> FULLY FOLLOWING THE PROCEDURES CITED <br /> IL VISUAL INSPECTION fN OPTION #3 OF APPENDI."N A. DAMAGE TO <br /> Prior[a setting=tk:io it*,inspect zxtcrior for damage., If rank TANK MAY OCCUR IF YOU DEVIATE FROM <br /> exterior is damaged,call factory regardiag correct repair procedures. THlc PROCEDURES AND SPECIFICATIONS- <br /> Exterior damage is indic3tzd when the blue calor of the FRP POI T-INSTALLATION: Complete the back-fill procedurzs to <br /> r <br /> laminate has shown a white fractured pattern, the top of tete tank- Complete all pilling and conacetiojis ensuring <br /> i that unused openings are secured tight with threaded steel plugs. <br /> ,i l I1, HANDLING Apply a 5 PSIG press=-tecr in the prim9ry tank and check for light- <br /> [ --- ness of piping connections and tarik manhole cover.. Gauge should <br /> Good construction engineering practice.common sense a W safety <br /> roust prevail during this phase-ELUTRON'tanks are not to be be checked prior to tesciug for accuracy and have a maximum limit <br /> dtnpped or mlled off of the delivery vclucte onto the ground or into of 0 PSIG. <br /> the hole-The lining hook or hooks provided must be used in combi- CAUTION= T1-lE PRIMARY TAINK TEST PRESSURE.SHALL, <br /> nation with the proper capacity unloading equipment. it is the NOT EXCEED 5 PSIG. DAMAGE TO TANK <br /> i responsibility Of the owner to provide the qualified personnel and MAY OCCUR. ISOLATE PiPING FROM TANK <br /> safe,proper unloading equipment,-with specific con sidctatron given BEFORE TESTING THr PIPING AT HIGHER <br /> to tank wetght and reach distance to Set tank in cxcavatirin. The PR£SSLCRES. <br /> preferred lifting cable included wigte is 60°and must never exceed The inch. tice(annular space)will be tested using option#'2 ar43 <br /> 120'-A spreader bar may be used ro achieve this.angle. in Appendix A. <br /> OPTION- Scc Appendix B for procedures to perform the <br /> IV. EXCAVATION DEPTH, Interstitial Vacuum 'fest that has been third party <br /> BEDDING AND BACKFILL_ evaluated to meet t.a EPA tank rightness test <br /> 4 Follow all apalicable local regulations and codes_ When pramcvl. <br /> r excavating.allow a mintmu-n cleararice of6--for backfill around the <br /> itank. For minimum butuil co\er.consult N.F_P.A-30- If burial cover VI1. VENTING <br /> over top of tank exceeds five (5) feet, consult factory. Raekfill T The PRIM.ILRY (inner) tank muse always be ventcd to <br /> materials sHctuld be clean, debris free, sand or pea $roue!. atmosphere. The interstitial spore does not rciluire venting. <br /> HydrncarNin exposed sand or pea gravel may be re-used if approved However,beak codes may require such interstitial vcntinb_Comply <br /> by the AW_Nanve sand may he used if approved by the tank man- <br /> with N,F,P.A, 90. <br /> uFatturer and the AHJ,Allow a minimum of I2"of bacetil bctwecn <br /> Traffic slab and all appurtenances that arc attached to the tank_ CAUTION: DO NOT MANIFOLD VENT FROM PRIMARY <br /> Damage to tank may t7CCtit iF Surface traffic loads are transmitted TANK TO VENT FROM INTERS—T3TIAL SPACE. <br /> directly to lank. <br /> V111. PLASTEEL"SEALING <br /> :%V. ANCHORING SYSTEMS PROCEDURES <br /> "Z'vCAUT'ION: The decisirnt to use an anchoring system is the These procedures must be performed prior to completion of <br /> reSpons,bdiry of the owner. Damage to the tank may backfill and AFTER TSST)NG To i=nsure complete corrosion pro- <br /> occur if the tank;is subicemd to movement. tection-the follawing instructions most be foltowed: <br /> Consult t_be: factory for number, size and type of holddown a. General instructions for working with fiberglass rvdn <br /> assemblies regtiurd when using a concrete pad under the tank. You BY carefully performing the:following steps,your ELUTR13W <br /> 05-10-1999 10:54Fth1 �. .�....�_..F',03^�. . . <br />