My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1756
>
2300 - Underground Storage Tank Program
>
PR0231300
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 11:50:41 AM
Creation date
11/7/2018 11:16:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231300
PE
2361
FACILITY_ID
FA0001858
FACILITY_NAME
MY MINI MART
STREET_NUMBER
1756
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11721005
CURRENT_STATUS
01
SITE_LOCATION
1756 N WILSON WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\1756\PR0231300\1998 REMOVAL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0KFILL EXCAVATION CERTIFICATE • <br />Project Location / /-t2(/ iv , wr v .I <br />C Phone No. 7 ) <br />Owner /�7 1��°/ <br />Contractor��//�/Iy`%% Phone No&t Y,/�TV /' License No. g BJZZ% <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.Fload ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12 lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (112) inch in diameter <br />_ B. Crushed rock—self-compacting material not more than three-quarters (314) inch in cross sectional <br />rmitted for backfill if contact <br />the backfill nmaterial and ctanks pipes made of poly rushed rock will not be resin glass or similar materials.) will be made between <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />qipirn <br />'t/m <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.