Laserfiche WebLink
" <br /> . . <br /> Page 8 . <br /> PERSONNEL <br /> 4.0 Personnel : <br /> 4. 1 Project Manager <br /> -Manages field operations. <br /> -Ensures the Work Plan is completed on schedule. <br /> -Briefs the field teams on their specific assignments. ' <br /> -Participates in the preparation of the Site Safety ' <br /> Plan. <br /> -Serves as a liaison with public officials. ^ <br /> 4.2 Site Safety Officer <br /> -Implements and enforces the SSP. <br /> -Assures that all on-site personnel have received a copy <br /> of the SSP, have read it and understand it . <br /> -Conducts frequent inspections of site conditions, <br /> ' <br /> facilities, equipment , and activities to determine if <br /> ' the SSP is adequate and being followed . ~ ~ <br /> -Conducts daily "tailgate" meetings to explain the plan <br /> of work for the day, mention potential hazards of the <br /> site. ~ ' <br /> - � <br /> -Ensures that protective clothing and equipment are, � <br /> properly stored and maintained . ' <br /> -Knows emergency procedures, excavation routes, and, <br /> notifies local emergency services when necessary. <br /> -Notifies the Health and Safety Manager of all accidents <br /> and injuries that occur on site. <br /> 4.3 On-Site Personnel : ` <br /> -Are required to document their full understanding of <br /> the SSP before starting work by signing that they have <br /> read the BSP and understand it . <br /> -Complies with the SSP. <br /> . ' <br /> � <br /> . . <br /> ~ <br /> ^ <br />