My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
2300 - Underground Storage Tank Program
>
PR0231304
>
INSTALL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:00:36 PM
Creation date
11/7/2018 11:24:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1986
RECORD_ID
PR0231304
PE
2332
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\2211\PR0231304\INSTALL 1986.PDF
QuestysFileName
INSTALL 1986
QuestysRecordDate
8/10/2017 9:55:11 PM
QuestysRecordID
3569860
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION/CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAL <br /> 1 . Provide the name and address of the facility. <br /> 2. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s) , and operator(s). <br /> _22,L3. Provide four complete sets of plans. (One to be retained by this office) . <br /> Include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> ji <br /> I . Location(s) and number of tanks. <br /> 2. ype of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. <br /> 1 . 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br /> in ground. <br /> B. Fiberglass <br /> 1 . Striker plate dimensions and materials. <br /> 2. Striker plates under all accessible openings. <br /> C. Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ). <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required) . <br /> D. Other types of tanks <br /> 1 . Construction specification standards for durability. <br /> 3. Tank Capacity (List specific gallonage) . <br /> 4. Contents to be stored in each tank (Be specific) . <br /> A. Verification of product compatability with the tank(s), piping, monitoring <br /> device(s) , epoxy or silicone glues , etc. <br /> 1 . List testing organization and approval . <br /> . 5. Provide manufacturers written installation instructions. (Include all , <br /> monitors , tanks , etc. <br /> 'eNote NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is require on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note NFPA 329 "Precision Test" required upon completion of installations. <br /> One test result copy to be sent directly to this department from the <br /> testing company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.