Laserfiche WebLink
UNDERGROUND TANK. INSPECTION RF.CUItn <br /> NEVI TANK INSTALLATION <br /> SITE NAME (t))7 7 �f �(�t r lt-jt (' INSPECTOR'S NANF. <br /> ADDRESS CITY 5 ZIP <br /> CONTRACTOR t NAME 1 4 , TELEPHONE ] <br /> OWNER 1 NAME _TELEPHONE_ <br /> DIS- INSPECTOR' <br /> DATE APPROVED APPROVED INITIALS <br /> EM OR EQUIPMENT INSPECTED <br /> INITIAL INSPECTION <br /> 1. Tank tg#ted upon delivery 1KnIIdslszteel) or air at SPSI PRP <br /> .% Visual inspection of secondary Containment. <br /> 3. Tank ae2ropriately placed with approved backfill. <br /> ✓ A. UL numbers ■nd tank capacities recorded. <br /> PIPING STAGE INSPECTION <br /> t 1. Pressure test of piping. J?rimaryand Secondar NFPA 3fl <br /> ba oat valvel Ins alled. <br /> 3. overfill protection installed, descriltd: <br /> A. Unused tank o ntn s sealed and cathodically Evotected.. <br /> S. Visual inaltectLon of secondary contaitteent on pipinjr. <br /> (lockab a rwRMr prop <br /> 6. Motatoript Ports in place &nd b eru h o Aradg, co" I <br /> 1. Fill and vent piping brought to Arade, <br /> A. PraducE line leak detector in place. Hard wired) <br /> 9. Approved tank Ieak monitoring device installed, <br /> LO. Ali salvanized piping and flttin s RroporlX wrapped. <br /> 1. Prensure decBX test on Complete tank and product deliver a ■Lem- <br /> I l FINAL 11:SPECTION <br /> It 1 <br /> a I . Precision Leet successfully �-m Ictc9 sial hut,) c4 .1c. recetwedi1gs <br /> ). Spill protecttoll at (ill i .e•. <br /> 3. ferfurrance test .,t nverrlll ,tt,trrt le.o t'.rsiert. <br /> 4. Pcrfset�anrc tvL;i „( it,-dm t II1w levw dcicctot . (Hard wtrcd) <br /> t�},� <br /> S. rcrforrance t e:u „f t ,nt l nuuu•: a 111 t t,i i to w st rw(:1 nn tank(s)M n <br /> S. Prtnit to operate appitcat I—, ,4- iety. <br /> 1. Acceptable recordkeerlisg s ett-s. <br /> OC MMF?rf3: <br />