My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
2300 - Underground Storage Tank Program
>
PR0231304
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:03:44 PM
Creation date
11/7/2018 11:27:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231304
PE
2332
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\2211\PR0231304\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
8/10/2017 10:08:34 PM
QuestysRecordID
3570041
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ooa ey <br /> ^e A.,�iu epYi <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATIO • FOR <br /> 1�J eOPN.� <br /> /� COMPLETE A SEPARATE FORM FOR EACH TANK SYST <br /> l.� 5 CHANGE OF INF MATION ❑ 7 PERMANENTLY CLO D ON E <br /> 1 NEW PERMIT ❑ 3 RENEWAL PERMIT <br /> MARK ONLY O ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK C URE ❑ 6 TANK REMOVED <br /> ONE ITEM 2 INTERIM PERMIT <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: a <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS"- SPECIFY IF UNKNOWN B MANUFACTURED BY: <br /> A. OWNER'S TANK I.D.k 3y �D /J <br /> D. TANK CAPACITY IN GALLONS: Q�l.r <br /> C. DATE INSTALLED(MOIDAYIYEAK) <br /> ILTANKCONTENTS IFA-11S MARKED,COMP ITEM C. to REGULAR n 3 DIESEL E] 6 AVIATIONGAS <br /> ❑ 1 MOTOR VEHICLE FUEL 4 OIL B. C. ❑ UNLEADED L�J-I 4 GASAHOL 7 METHANOL <br /> A' ❑ 80 EMPTY ❑ 1 PRO UCT ❑ 1bUNLEADED ❑ 5 JET FUEL ❑ <br /> ❑ 2 PETROLEUM <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN WASTE ❑ 2 LEADED F799 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> C.A.S.%: O <br /> D. IF IA.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES AB.AND C.AND ALL THAT APPLIES IN BOX <br /> ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> A. TYPE OF 99 OTHER <br /> ❑ <br /> SYSTEM SINGLE WALL 4 SECONDARY CONTAINMENT (VAULTED TANI() <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL E] 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B TANK ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br /> (Pl AT TAnk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> F-1❑ 5 GLASS LINING 1:1 1 RUBBER LINED <br /> 2 AL D LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— N <br /> ❑ ❑ L WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> POLYETHYLENE WRAP 2 COATING 3 VINY <br /> D.CORROSION ❑ 1 ❑ gg OTHER <br /> PROTECTION F-15 CATHODIC PROTECTION ❑ 91 NONE <br /> 95 UNKNOWN <br /> ❑ <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IFAPPLICABLEY�GR <br /> p U 99 OTHER <br /> A. SYSTEM TYPE A U <br /> 1 SUCTION A U 2 PRESSURE p <br /> B. CONSTRUCTION A 1 SINGLE WALL p U 2 DOUBLE WALL A U 3 LINED TRENCH p U 95 UNKNOWN A U 99 OTHER <br /> A BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> C. MATERIAL AND A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL WI COATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> CORROSIONCATHODIC PROTECTION A U 95 UNKNOWN A U 99 O ER <br /> 10 <br /> PROTECTION A U 9 GALVANIZED STEEL A U 3 IMERSTITIAL g9 OTHER <br /> 1AUTOMAI LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MONITORING <br /> D. LEAK DETECTION ❑ -- <br /> V.TAN EAK DETECTION <br /> 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 IN MONITORING ❑ 91 NONE ❑ <br /> 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION 3.WAS TANK FILLED WITH YES `❑ NO ❑ <br /> 2.ESTIMATED QUANTITY OF GALLONS INERT MATERIAL? <br /> 1.ESTIMAT D DATE LAST USED(MOIDAVfIR) SUBSTANCE REMAINING <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> A <br /> APPLICANT'S NAME <br /> (PRINTED B SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW TANK# <br /> COUNTY# JURISDICTION# FACILITY# <br /> STATE LDAJI LyylYll )'I <br /> PERMIT EXPIRATION DATE <br /> PERMI:NIl B PERMIT APPROVED BVIDATE <br /> FORM B (9-90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FOR903413-114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.