Laserfiche WebLink
MonthlInslaectacan - Page 2 of 2 <br /> PAPERWORK INSPECTION Y N NJ Date Done <br /> 7 <br /> The above are urunlly done together on an nnnual basis for local for <br /> Line Tightness (usually u2on construction or when no positive shutdown) <br /> Ta k Tightness (usually only after construction or when using SIR) <br /> ondary containment(SB989) tests have been completed(usually every 3 yrs <br /> y teslin or mnintenancethem be ow: <br /> ntenance: FFIT :- <br /> rcsmaintenance: <br /> if <br /> C.t77-mments: .<�9 sp lvl C'WA r <br /> cLpd 0) c ori' <br /> _ <br /> I i--ms Requiring Follow-Lip Actions: <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> Acopy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designated Operator must alert the UST owner or operator of any condition discovered during the <br /> m&thly inspection that nITY require folrow-up actionP* <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the <br /> previous 12 months. Records must be maintained on-site or, if approved by the local agency, off-site a(I <br /> a readily available location. <br />