Laserfiche WebLink
• � fso�"ce. <br /> STATE OF CALIFORNIA `o <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B »e <br /> ro . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT --WTEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILRY NAME WHERE TANK IS INSTALLED: Y <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# D B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: V <br /> II.TANK CONTENTS IFA-IISMARKED,COMPLETEITEMC. <br /> A. L— 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1.REGUL R 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑\2 PETROLEUM E:180 EMPTY / PRODUCT 1b PREMIUM 4 GASAHOL 7 METHANOL <br /> ❑ UNLEADED ❑ 5 JETFUEL ❑ <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.0: <br /> III. TANK CONSTRUCTION MARKONEITEMONLYINBOXESA,B,ANDC,ANDALLTHATAPPLIESINBOXDANDE 77406—' lP SrQdl L.r23,� <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN ALJ <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATISLE W/FRP <br /> (PrimeryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING _ <br /> IS LINING MATERIAL COMPATIBLE WI H 100% METHANOL? YES_ NO I/ •k <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) v OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U / SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> S. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH < 95 UNKNOWN p U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STE W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION <br /> A 5 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ J <br /> MONITORING <br /> —] 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORM TION <br /> 1.ESTIMATED DATE AST SED(MOID Y/YR) 2.ESTIMATED QUANTITY OF Vw 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING /� LOTUS INERT MATEgIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> IPflINTED 8 SIGNFTUFEI DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE 04 = ELI:= ❑ ❑T7 � �� 1 <br /> PERMIT NUMBER ERMITEX <br /> PERMIT APPROVED BY/DATE PPIKA I ION DATE -� I y r <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED <br /> FORM B (12-91) .MROWBR6 <br /> .FILE THIS FORM WITH T.YF LOCAL AGENCY IMPLEMENTING THE UNDERGROUND ST�GE TANK REGULATIONS <br />