My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1989-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODSON
>
3212
>
2300 - Underground Storage Tank Program
>
PR0234183
>
COMPLIANCE INFO 1989-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:27:56 AM
Creation date
11/7/2018 11:48:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2004
RECORD_ID
PR0234183
PE
2332
FACILITY_ID
FA0003667
FACILITY_NAME
M M HARVESTING
STREET_NUMBER
3212
Direction
E
STREET_NAME
WOODSON
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00514531
CURRENT_STATUS
02
SITE_LOCATION
3212 E WOODSON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WOODSON\3212\PR0234183\COMPLIANCE INFO 1989-2004.PDF
QuestysFileName
COMPLIANCE INFO 1989-2004
QuestysRecordDate
10/12/2017 6:40:24 PM
QuestysRecordID
3676972
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. ALLEGED VIOLATIONS <br /> 1. California Health & Safety Code (H&SC) section 25292 (b)(C)(5)(A): Mrs. Ruth <br /> Marsili/Marsili Brothers failed to monitor the 4,000-gallon diesel UST as required by this <br /> section. (Modified Monitoring Alternative#7—Tank Gauging) <br /> 2. H&SC section 25292 (d): Mrs. Marsili/Marsili Brothers failed to meet the December 22, 1998 <br /> deadline for upgrade/removal of the 4,000-gallon diesel UST as required by this section. <br /> 3. H&SC section 25298 (a) & California Code of Regulations (CCR) 2670 (f): Mrs. Marsili/The <br /> Marsili Brothers illegally removed a 4,000-gallon diesel UST without a Closure Permit and <br /> inspection from the EHD. <br /> 4. H&SC section 25298 (c)(4): Mrs. Marsili /Marsili Brothers have failed to complete the UST <br /> closure by not submitting closure information including: soil sample results (east end tank <br /> soil sample results are missing), tank certification, tank tracking record, or the manifest for <br /> tank rinsate. <br /> V. SITE HISTORY <br /> October 3, 1989 <br /> Jaime Favila made an entry on the narrative sheet starting a farm UST file. Favila used The Farm <br /> Tank Information form completed by Mrs. Ruth Marsili on September 29, 1989 to register four tanks. <br /> The four USTs are #1 - 4,000 gallon diesel tank, #2 - 768 gallon compartmentalized with #3 - 278 <br /> gallons gasoline tank, and UST #4 - 375 gallon gasoline tank. Tank #2, #3, & #4 are considered <br /> exempt tanks (CCR 2621) as they are "Farm Tanks" [CCR 2611: "Farm Tank" means any one tank <br /> or a combination of manifolded tanks that: 1) are located on a farm; and 2) hold no more than 1,100 <br /> gallons of motor vehicle fuel which is used primarily for agricultural purposes and is not held for <br /> resale.] and are not required to comply with UST regulations. <br /> November 9, 1989 <br /> Letitia Briggs completed A& B forms to place USTs on the database. <br /> May 15, 1990 <br /> Kasey Foley phoned Mrs. Marsili to set up an UST inspection. <br /> May 17, 1990 <br /> Kasey Foley made an UST inspection with Mrs. Marsili, and wrote up an inspection report. The <br /> report instructed Mrs. Marsili to monitor the tank, #1 — 4000 gallons diesel, using Modified <br /> Monitoring Alternative#7 (tank gauging). Foley left Mrs. Marsili a list of precision testers. <br /> December 1998 <br /> Eric Trevena spoke with Eugene Marsili on two occasions prior to the December 22, 1998 tank <br /> upgrade/closure date. Trevena discussed Closure Plan requirements for the regulated UST at this <br /> site, and left a Closure Plan at the counter for Marsili to pick up. Trevena told Marsili that owners of <br /> UST's could remove USTs, but a Closure Plan would still be required to be submitted to the office <br /> identifying who would be decontaminating the UST, taking the soil samples etc., prior to UST <br /> removal. On December 23, 1998, Trevena listened to a voice mail message from Marsili that stated <br /> he took out the tank. On December 23, 1998, Trevena phoned Marsili who explained he took out <br /> the UST and it was sitting next to the location it was removed from. Mr. Marsili was asked why he <br /> didn't submit the Closure Plan to EHD before the UST was removed. Mr. Marsili explained that he <br /> did not understand he had to submit one. Mr. Trevena told Mr. Marsili he was still required to <br /> submit the Closure Plan. <br /> January 22, 1999 <br /> Letitia Briggs received a phone call from Eugene Marsili. He inquired about the tank he removed. <br /> E. Marsili admitted he did not have a permit. Briggs told him a permit was required and to submit <br /> one on the application form Trevena provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.