Laserfiche WebLink
BOARD OF TRUSTEES <br /> SAN•AQUIN LOCAL HEALTH DISTRICT SERVING <br /> Jame& Culberlson, P(ee. I City of Lodi <br /> P.Irlcla E. Vannuccl, Secy. 1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br /> Anlhonstle Van Spronasn City of Escalon <br /> Earl Plmentel Stockton, California 95201 Cltyof Manteca <br /> City of Ripon <br /> Fern Bu bee 209/466-6781 <br /> City of Stockton <br /> Genial L. Flores <br /> John 0. Mast, M.D. City of Tracy <br /> William J. Wade Jopl Khanna, M.D., M.P.H., Oletrlct Health 011lcar San Joaquin County <br /> Mary Anna Love r San Joaquin County <br /> Facility Name nj &OS <br /> Addi , ss 9q 9 L _ LUcnoLA)RIP I') N1 okflT A 9533 L.) <br /> Date of i �pection Inspector ). ci6,e �CVr tG S- <br /> MONITORING ALTERNATIVE 87 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the ligtlic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> __j,�Annual precision test on tank and piping. <br /> L,-"Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> ✓Tank must have no inputs or withdrawals--for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> 0/L (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours) . <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> c. If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours , as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> CID Precision test(s) must be performed by 2--j-29 and results submitted to this <br /> office within 30 days of the test. <br /> Tank gauging must be started immediately. (See instructions above), <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />