Laserfiche WebLink
Tanknology Inc. <br />11000 N. MoPac Expressway, Suite 500 Austin, TX 78759 (800) 964-0010 Policy ] 00-29-A <br />Rev: D <br />�� JOB CLEARANCE FORM & Revised: 1/24/2014 <br />SITE SAFETY CHECKLIST - OVF <br />Site Name/#: <br />Street Address: ldt� yUJ <br />W.O. # <br />Ir /"761/' <br />/y7 <br />Z3 / <br />Arrival Time <br />Departure Time: <br />Travel Time: <br />Others on site: <br />Date <br />ii �r <br />-32 <br />—10 <br />Scope of Work and Tasks Performed (JSA's must be available for all tasks): <br />/) <br />Repairs to Equipment or Parts Provided: <br />Follow-up actions required; equipment isolated; comments: <br />Gk itis rP, SSLd <br />PPE - PERSONAL PRO ECTIVE EQUIPMENT REQUIRED Check items used or mark — if notapplicable) <br />? Safety Vest <br />Safety Glasses <br />Gloves <br />Hearing Protection <br />Steel Toe Boots <br />t I Splash Goggles <br />( Hard Hat <br />Other <br />✓ PRE-TEST PROCEDURES (Check each item completed or mark ^ if not applicable) <br />1. Discuss safety procedures with site personnel. Nearest hospital: <br />2. `[' Prior to fuel deliveries the UST system must be placed back into working order. <br />3. -[r Secure entire work area with barricades (cones, flags, and caution tape, pennant flags, or other perimeter guard). <br />4. Place fire extinguishers and "No Smoking" signs in the work area. <br />5. ! : Implement Lockout[Tagout per API 1646 (when accessing product piping during tasks) <br />L] All applicable equipment disabled during test(s). [ '.' Secure the circuit breaker(s) with lockout devices and tags. <br />[ ; Secure nozzles with "Out of Service" bags and nylon ties. Verify LOTO is complete by trying to operate pumps. <br />[ 1 Close ball valves or check valves on product piping. Disconnect electrical "bayonet" connector from the STP(s). <br />SIGN IN <br />Lead Technician Name <br />Lead Technician Signature <br />General Safety Checks: <br />All site have been informed. <br />personnel <br />Fuel delivery has been informed. <br />Site Representative Name <br />Site Rep sen ti Signatu <br />Is a fuel delivery due today? <br />LOTO procedures have been discussed and agreed. <br />NAKU M D LT <br />�1 <br />Work areas barricaded to protect workers, staff &public. <br />I have discussed job clearance form with teth(tician. <br />✓ POST-TEST PROCEDURES (Check each item completed or mark ~ if not applicable) <br />1. Remove all "Lockout/Tagout" devices. <br />2.] Run all pumps and verify there are no leaks: C1 Impact Valve Test Ports under dispensers <br />Leak Detector Threads on STP's ] Functional Elements & Relief Screws <br />3. J Install lead wire seal on all test plugs & leak detectors that were serviced. <br />Count LD threads: L1 L2 L3 L4 L5 L6 <br />4. Check following components operational: ATG probes, sensors, & caps <br />[ ; Ball floats, dry breaks & caps C Cathodic protection operational <br />[ _ Containment sumps are dry [ Dispensers & POS operational <br />Dispenser panels are replaced ''[Z' Drop tubes, fill adapters & caps <br />Leak detectors & vent tubes [ 1 Manhole covers and sump lids <br />Monitoring system is operational [ 1 Shear valves are open <br />[ ] Siphon lines and manifold valves [_l Siphon lines and manifold valves <br />`' [ i STP fittings and bayonet connectors [ 1 Vents (not capped, plugged or isolated) <br />5. Remove barricades. <br />SIGN OUT & Operator Verification of Work (OVF) <br />Lead Technician Name <br />Lead Technician Signature <br />General Safety Checks: <br />Work area has been left tidy & safe. <br />Site staff are aware of work status including any remaining isolation. <br />site Rep esentative Name <br />Site Repr n e signature <br />Changes to equipment are documented and communicated. <br />All incidents, near incidents, and unsafe situations reported. <br />L W L <br />./ Y lL(/ <br />Site Representative Comments: 1 <br />COMPANY CONFIDENTIAL © Tanknology Inc., 2011. All Rights Reserved. <br />Printed copies of this document are uncontrolled. The current version is available in the Tanknology On -Line Document Control S stem. <br />