My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 8:09:02 AM
Creation date
11/7/2018 11:53:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7-ELEVEN INC #17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1048\PR0231462\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
8/8/2016 6:25:14 PM
QuestysRecordID
3140675
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> • Yes r No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes r No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> • Yes r No* Was accuracy of system product level readings tested? <br /> • Yes r No* Was accuracy of system water level readings tested? <br /> • Yes No* ere all probes reinstalled properly? All 2 1 2011b <br /> • Yes r No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. ENVIRONMENTAL <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. HEALTH DEPARTMENT <br /> Complete the following checklist: <br /> Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check a#that <br /> r N/A apply)Simulated leak rate:r 3 g.p.h.; r 0.1 g.p.h; r 0.2 g.p.h. <br /> Yes r No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes r No* Was the testing apparatus properly calibrated? <br /> • Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> • Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system is disabled or disconnected? <br /> Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system malfunctions or fails a test? <br /> Yes r No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Id were not tested <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.