My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 8:09:02 AM
Creation date
11/7/2018 11:53:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7-ELEVEN INC #17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1048\PR0231462\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
8/8/2016 6:25:14 PM
QuestysRecordID
3140675
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legend <br /> ` W. Yosemite Ave o Gasoline-87 <br /> • Gasoline-89 <br /> J LL • Gasoline-91 <br /> :! O Diesel <br /> 7 �— <br /> �� � � C_ • Vapor <br /> QO Annular <br /> Submersible Turbine Pump <br /> �. _J Cc: O TLM Probe <br /> N j , Monitoring System Panel <br /> Lk n •� 8 Emergency Shut-Off Switch <br /> ILA' Li cope of Work: To remove and replace the existing UL (87) and Q Overfill Alarm <br /> PUL (91) direct-bury OPW Fill Spill containers, due to a recent S Float&Chain <br /> failed test. 0 Sump/UDC Sensor <br /> •Sawcut, remove and dispose of the concrete at each of two (2) Interstitial Sensor <br /> 0 0 Vacuum Sensor <br /> o ° o ° spill containers. O Line Leak Detector <br /> 0 *Remove and dispose of the existing spill containers. ♦ ISO Flow Meter <br /> 4 <br /> *Install all Source NA furnished OPW spill containers, swivel � ISD Pressure Sensor <br /> 0o Spill Containment Kit <br /> adapters, caps, face seal adapters and jack screw kits. <br /> 00 •Obtain the required CUPA inspection prior to backfill. <br /> o = o •Backfill and restore all concrete removed for this work. <br /> 0 0 <br /> *Obtain all CUPA inspections and provide all CUPA and Air N <br /> Quality testing. o <br /> Ln <br /> N a <br /> D <br /> ig <br /> H <br /> �o <br /> ing F <br /> O ® _ o <br /> m n <br /> W mm <br /> 00 <br /> ai N <br /> Q Cl) <br /> (0 C') <br /> C <br /> 0 (_) <br /> CU <br /> N N <br /> LUc <br /> m m <br /> a ti o <br /> A g Healy �pII(�i <br /> `p p n HCAS <br /> O -(l O <br />
The URL can be used to link to this page
Your browser does not support the video tag.