Laserfiche WebLink
MONITORING SYSTEM CERTIFICATION <br />__ CERTIFICATION /TEST DATE: May 26, 2016 <br />Al. FACILITY <br />A2. OWNER <br />Name 7 -Eleven Market #2368/ Store #17647 <br />Name 7 -Eleven, Inc � -1•„, �rr6' <br />Address 1046 West Yosemite, Manteca, CA 95336 <br />Address P.O. Box 711, Dallas, TX 75241 • l'� •� - <br />Phone# 209-239-2329 <br />Phone # 605-523-2949 <br />Contact Stephen Boyd <br />Contact Stephen Boyd <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Checkthis box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment Is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No ` Has all input wiring been inspected for proper entry and termination, Including testing for ground faults? <br />❑ Yes ❑ No • were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No • Was accuracy of system product level readings tested? <br />❑ Yes ❑ No Was accuracy of system water level readings tested? <br />❑ Yes ❑No' Were all probes reinstalled properly? <br />I• ElYes ❑ No Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑ Yes ❑ No For equipment start-up or annual equipment certification, was a leak simulated to verity LLD performance? <br />❑ WA (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No' <br />Were all LLD* confirmed operational and accurate within regulatory requiremems? <br />❑ Yes <br />❑ No • <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ WA <br />❑ Yes <br />❑ No' <br />For electronic LLDs, does the turbine automatically shut off N the LLD detects a leak? <br />❑ WA <br />❑ Yes <br />❑ No . <br />For electronic LLDs, does the turbine automatically shut off N any portion W the monitoring system Is disabled <br />❑ WA <br />or disconnected? <br />❑ Yes <br />❑ No • <br />For electronic LLDs, does the turbine automatically shut off N any portion of the monitoring system malfunctions <br />❑ WA <br />or falls a test? <br />❑ Yes ❑ No' For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ WA <br />❑ Yes ❑ No ` Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencles were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />