Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />r" Check this box if tank gauging is used only for inventory control. <br />r Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Ya <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />No* <br />Nere all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Nas accuracy of system product level readings tested? <br />Yes <br />No* <br />Nas accuracy of system water level readings tested? - <br />Yes <br />No* <br />Nere all probes reinstalled properly? <br />• Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs are not installed. <br />Complete the following cheddist: <br />a <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />• Yes <br />No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? (Check all that <br />apply) Simulated leak rate: r3 g.p.h.; r 0.1 g.p.h; 1 0.2 g.p.h. <br />N/A <br />• Yes <br />No* <br />Nere all LLDs confirmed operational and accurate within regulatory requirements? <br />• Yes <br />No* <br />Nas the testing apparatus properly calibrated? <br />• Yes <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />Ya <br />No* <br />or electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />• N/A <br />• Yes <br />No* <br />or electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />onitoring system is disabled or disconnected? <br />• N/A <br />• Yes <br />No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />onhoring system malfunctions or fails a test? <br />• N/A <br />• Yes <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />• N/A <br />• Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 12/07 <br />