Laserfiche WebLink
r • y1 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN— PAGE 1 (one form per facility) <br /> an.. <br /> TYPE OF ACTION A 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID p (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Rot. <br /> ff�{ S c� <br /> BUSINESS SITE ADDRESS ao3. CITY R04. <br /> 17-S w - C S33 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will lake immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick Floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> IH. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Ll aFP— RID. R20 AN y <br /> r Mo. <br /> � <br /> ^ / RIs. P=/V1 R21. "I, <br /> ! M / R12. /�".^ R22. n NL <br /> R13. �O M. f� r,- R33. <br /> &6qT P4-4> <br /> K R14. R24. RN. <br /> R15. R25. Ms. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME <br /> fA-MWA,1 A n1 Roo. TITLE� 44 a5o. <br /> NAME R41- TITLE R51. <br /> NAME R42. TITLE R52, <br /> mw Ai�mo NAME R43TITLE R53 <br /> V. INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be verified directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a lank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO VERIFY THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> Rbo. <br /> hwfwm-e(9/24/04)-1/3 <br />