Laserfiche WebLink
a 3 <br /> SAN JOAQU LINTY ENVIRONMENTAL HEALTH DT*,*,OtTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mot. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. Mot. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FFO(�[�t�,`'LOWING UST SYSTEM(S): t�„��" <br /> "=11�-��Wit,%5t�r. �`+,.'`Y'.." ; ..zOJ.. . r O' "M4i�i5^ir's5 L �,§b�)sSa;F. � S=:'H� i3Ea-0i,•'? , s'','i�i3F3[I? <br /> ,)- , s MUM _ ha"• se's ix'� '� °"'y <br /> FACILITY ID�(.igency Use Only) KIM, <br /> FACILITY NAME D'S Moa. <br /> FACILITY SITE ADDRESS i ZSi"' L�; �: M04. cn-y - �� 7 Mo5. <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Moe, <br /> accordance with the equipment manufacturers'instructions,or annually;whichever is more frequent Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): Mer. <br /> .: .. e. (.may o. •r. err <br /> A t' ffs 6 t� i t A L 3) H 4` ' <br /> iter. Y,:�er.: .i - 5'.�. %. <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> Corm,Hazardous Materials Business Plan ma ,etc. which shows all re uircd information,include it with this. lana. <br /> BMWiny <br /> s 19 <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mto. <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: X a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MI1. <br /> PANEL MANUFACTURER: Veld e- R-&(V- _ M13' MODEL#: ­ '�n"e-S Mia. <br /> LEAK SENSOR MANUFACTURER: •e-r Min. MODEL#(S): D MM3. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLF.WALL TANK(SI <br /> PANEL MANUFACTURER: MI6' MODEL#: MIS. <br /> INJANK PROBE MANUFACTURER: M15. MODEL.#(S): MIs <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑' c.WEEKLY M20. - <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. _ ❑ Is.0.2 g.p.h. ❑ c.OTHER(Specify): M22. NU3. <br /> 0 3. INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 0 b,STATISTICAL PER 23 CCR§2646.1 M2o. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M2s. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ Is.BIENNIALLY ❑ C•OTHER(Specify): W6. bur. <br /> jK6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Rrqulrn nyeney epp-vd) _ <br /> ❑ 99.OTHER(Specify): Mrs. <br /> a <br /> % rsr.r , r r s n <br /> r <br /> .rep :. _ ej'';,°q? JY. s V'alyP Q1llA"kn CiiFr .v.. .eMn"- <br /> F. B5. <r y: <br /> s:, x h <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) tMo. <br /> O(1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SYTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT 1S: ea.DRY ❑ b.LIQUID FILLED El c.UNDER PRESSURE ❑ d.UNDER VACUUM Mat <br /> PANEL MANUFACTURER: VR-g -'do- �JI' Ms2' MODEL#: ?L^d MSs. <br /> LEAK SENSOR MANUFACTURER: it _ K Mai. MODEL#(S): M33. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? - a.YES Elb.NO ""u- <br /> WILL <br /> WILL FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? pl a.YES ❑ b.NO Mar. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED �g <br /> MLLD MANUFACTURER(s): M3& MODEL#(S): 'T M39. <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINEL/Y�.PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Uc�. e/ �/7vr M40' MODEL#: Q2Q 2[4LL� M°I <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ NUAL 0.1 g <br /> b.MINIMUM AN .p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 a.YES 0 b.NO M<a. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 a.YES ❑ b.NO Moa' <br /> ❑ 4.INTEGRITY TESTING <br /> M43. Mab. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> 5NISUAL MONITORING DONE: ❑ a.DAILY ❑ It.WEEKLY" ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" Mor. <br /> e Requirnsegacyapparnl ee.Nlomd for monitoring ofunburied emergaLcy generator Pod piping only per HSC 525281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mae. <br /> ❑ 99.OTHER(Specify) 07/23/03 <br /> e rrcrrn_n m9/illi.114 <br />