GENERAL NOTES _
<br /> I. FOR EXISTING SITES WHERE POSSIBLE CONTAMINATED MATERIALS EXIST, THE 12. PIPING SYSTEMS SHALL BE TESTED AS FOLLOWS: 16. INSTALL NEW CONCRETE TANK MAT AND OTHER CONCRETE AS INDICATED ON SITE _
<br /> CONTRACTOR'S EMPLOYEES SHALL HAVE COMPLETED 40 HOURS OS14A TRAINING A PETROLEUM PIPING TEST PROCEDURE: PLAN. . CONCRETE TO BE INSTALLED ACCORDING TO TYPICAL CONCRETE INTERRUPT
<br /> COURSE PRIOR TO THE START OF WORK. (CERTIFICATE REQUIRED) SPECIFICATIONS. DRIVE SLAB SHALL BE 6' THICK. TANK SLAB SHALL BE 8" THICK. REINFORCING
<br /> CONTRACTOR SHALL FURNISH COPIES OF ALL APPROPRIATE CERTIFICATES TO 1. CONTRACTOR SHALL NOTIFY LOCAL INSPECTORS AND COMPANY REPRESENTATIVES PRIOR TO SEE SITE PLAN AND DETAIL SHEET. ---"-"- FIBER EXPANSION JOINT ICV / l/I F�OI ,�, Wl/0111 ES, IIWi,
<br /> THE OWNER. _ ANYTESTING WITH AT LEAST A 24 HOUR NOTICE. AT JOINT 1/Y MUSTCONFORMTO ASTM
<br /> 17. INSTALL DISPENSERS AND CONSOLES AS INDICATED ON SITE PLAN AND
<br /> 2. CONTRACTOR EMPLOYEES SHALL HAVE COMPLETED "SMITH FIBERGLASS RED 2. CONFIRM TESTING PROCEDURE WITH LOCAL AGENCIES PRIOR TO TESTING. DESCRIBED IN THE EQUIPMENT LIST. --- TOOT TO 1/4" RADIUS �� C �-{ r, L (� r 5
<br /> THREAD IIA TRAINING" (CERTIFICATE REQUIRED). CONTRACTOR SHALL - - v v
<br /> COMPLFTE THE 'FIBERGLASS PIPING SYSTEMS INSTALLATION CHECKLIST FOR 3. PRIMARY TESTING: 18. PATCH PAVING. (MIN. REQUIREMENTS IF NO SOILS .REPORT):
<br /> UNDERGROUND PETROLEUM PIPES' AND SHALL FURNISH THE OWNER WITH
<br /> COPIES OF ALL APPROPRIATE CERTIFICATES. (1) UPON COMPLETION OF PKIfY PIt AND BEFORE GLUING. SECONDARY A. ALL AREAS*TO BE PATCHED MUST BE SQUARE CUT W�TH PAVEMENT P L A E R S
<br /> HAS f0 BE INSTALLED PRIG TO GLUING OF PRIMARY. TEST IS TO BE BREAKER" OR CONCRETE SAW. ., -
<br /> 3. CONTRACTOR SHALL HAVE BEEN TRAINED BY "FLUID CONTAINMENT, TANK IN CONDUCTED AT THREE TIMES THE WORKING PRESSURE OF THE SYSTEM 0. EXCAVATE ALL AREAS TO A DEPTH OF 6" AND REPLACE WITH 2" AC
<br /> F TANK INSTALLATION" CONTRACTOR SHALL COMPLETE THE "TANK INSTALLATION - OR NOT TO EXCEED 60 PSI. OVER 4" CRUSH ROCK OR CONCRETE BASE. -
<br /> CHECKLIST" (SUPPLIED TO CONTRACTOR BY FLUID CONTAINMENT CURING TANK
<br /> DELIVERY) AND SHALL FURNISH A COPY OF THIS DOCUMENT TO THE OWNER. (o) BEFORE APPLYING PRESSURE, VERIFY THE FOLLOWING HAVE BEEN COMPLETED: C. - PATCH PAVEMENT FOR DISTANCE OF 2' AROUND ALL NEW CONCRETE UNLESS
<br /> RETROMAT OVERLAY IS CALLED FOR. -
<br /> 4. CONTRACTOR SHALL DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK INSTALL- • VERIFY SHEAR VALVES ARE CLOSED. "' 3633 SEARDIRT<BLVD., SUITE C
<br /> ATION PRIOR TO THE START OF WORK. CONTRACTOR SHALL CONDUCT WEEKLY VERIFY ME BALL VALVE CLOSEST TO THE TURBINE IS CLOSED.
<br /> JOB SIZE SINGLY MEETINGS WITH ITS EMPLOYEES. •
<br /> • THERE MUST NOTE: ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE OF THE ABOVE WEST SACRAMENTO, CA. 95691
<br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING LICE-HSGs AT A MINIMUM: BEING TESTED.. JY{QW GAUGES (0-700 PST) PER PRODUCT SCOPE OF WORK SHALL BE DONE ON A FI-KNE (810) $73'0700
<br /> TIME AND MATERIALS BASIS, RENTAL RECEIPTS, FAX, (916) $71-0200
<br /> A. GENERAL ENGINEERING UB (b) PROCEDURES TO FOLLOW MIEN APPLYING PRESSURE: SUBCONTRACTOR LABOR
<br /> �INVOICES,SHEETS
<br /> MATERIAL RECEIPTS,
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING . AND DAILY LABOR TIME SHEETS SHALL BE REQUIRED E-MAIL � IG&ane.net
<br /> * MAKE SURE PERSONNEL ARE KEPT AWAY FROM PIPING SYSTEM WRING 'YO SUPPORT GENERAL CONTRACTOR TIME AND
<br /> 6. CONTRACTOR SHALL HAVE AND MA.INTIAN THE FOLLOWING INSURANCE: ANY TIME INITIAL PRESSURIZATION IS BEING APPUED. MATERIAL INVOICES. SUCH WORK SHALL BE BILLED
<br /> c • APPLY PRESSURE IN 15-20 PSI INTERVALS UNTIL REACHING A MAXIMUM SEPARATELY OR AS AGREED BY OWNER & CONTRCACTOR. 01999 LEX COFFROTH & ASSOCIATES
<br /> A. CONTRACTOR SHALL SUBMIT PROOF LS ALL REQUIRED INSURANCE 70 THE OWNER PLANS MAY NOT BE REVISED, COPIED, OR
<br /> AND SHALL NAME THE OWNER AS "ALSO INSURED." OF 60 PSI. REUSED WITHOUT PRIOR WRITTEN PERMISSION
<br /> • MARK CRITICAL PRESURES ON GAUGES WITH ELECTRICAL TAPE At THE - EXPANSION JOINT OF LEX COFFROTH, ARCHITECT.
<br /> B. COMPREHENSIVE GENERAL LIABILITY, INCLUDING CONTRACTOR'S BEGINNING OF EACH TEST.
<br /> PROTECTIVE LIABILITY, COMPLETED OPERATIONS LIABILITY, AND SCALE. N.T.S.
<br /> CONTRACTUAL LIABILITY, WITH A COMBINED SINGLE LIMIT OF NOT LESS • SOAP TEST PIPING WITH (I CUP DISH SOAP TO (2)) GALLONS OF WATER,
<br /> THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND SPRAY FITTINGS AND UBSE WITH A MIRROR TO SEE UNDERSIDE AND - 5 D ARC.,
<br /> i
<br /> PROPERTY DAMAGE. ALL AROUND FITTINGS. OBSERVE FOR BUBBLES AS EVIDENCE OF A LFA(. _, ___ �V 1y,�.T•u'TDF,p TFc
<br /> • AFTER PROVING SYSTEM TIGHTNESS, APPLY-60 PSI PRESSURE, HOLD FOR
<br /> C. EMPLOYEES LIABILITY WITH A MINIMUM LIMIT OF UABILTIY OF $1,000,000 ONE MINUTE, THEN RELEASE PRESSURE. REPEAT PRESSURIZATION CYCLE ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED •k 7 G^13842 yt
<br /> FOR EACH OCCURRENCE. A MINIMUM OF (5) TIMES. BY LICENSED C61-D40, C-36, GENERAL A OR GENERAL B '
<br /> WITH HAZARDOUS MATERIALS CERTIFICATE CONTRACTOR
<br /> D. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED 141PEO VEHICLES • UPON COMPLETION OF THE ABOVE TESTS, KEEP PRESSURE AT 60 PSI FOR THESE PLANS ARE DIAGRAMATIC IN NATURE AND ARE NOT 's"T .wdw xa, �•4�
<br /> WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIADIUTY OF NOT A MINIMUM OF (3) HOURS. OBSERVE PRESSURE GAUGES FOR ANY LASS. INTENDED TO BE EXACT REPRESENTATION OF THE FINAL
<br /> CALL
<br /> LESS THAN $1,000,000 PER OCCURRENCE FOR ROPILY INJURY AND • SYSTEM SHOULD 0E KEPT A7 20 PSI FOR DURATION OF PRODUCT. THESE PLANS SHALL 0E USED 0'f THE 0F�-....,_-�.-�
<br /> PROPERTY DAMAGE. CONSTRUCTION AND SHALL 60 CHECKED FREQUENTLY. CONTRACTOR AS AID ONLY. CONTRACTOR SHALL BE
<br /> RESPONSIBLE FOR THE COMPLETE INSTALLATION OF TANKS, CONTRACTOR:
<br /> 7. GENERAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, 4. SECONDARY TESTING; PIPES, AND ALL EQUIPMENT ASSOCIATED WITH SCOPE -
<br /> AND SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL' TO, THE OF WORK:
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR (1) UPON COMPLETION OF 3F.f hWj PIPING AND BEFORE PLACEMENT OF ANY ��
<br /> REQUIRED BY THE DRAWINGS. BACKFILL, TEST SECONDARY PIPING AS OUTLINED BELOW. TEST AT 5 PSI AND AT - 1LNER
<br /> NO TIME EXCEED 10 PSI, BEFORE APPLYING PRESSURE, VERIFY THE FOLLOWING g� 1 CT
<br /> /�
<br /> 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM BUILDING HAVE BEEN COMPLETED: CONSTRUC I ION
<br /> CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL. CODE, CALIFORNIA UNDER- (p) • VERIFY ALL SECONDARY CONTAINMENT BOOTS ARE IN THE CLOSED POST- - - INC.
<br /> STORAGE TANK REGULATIONS, OSHA CONSTRUCTION..SAFETY ORDERS, 'TION AND THAT ALL CLAMPS ARE SECURE AND TIGHT.
<br /> AND ANY OTHER APPLICABLE FEDERAL, STATE, CITY, OR COUNTY ORDINANCES. • 'THERE MUST BE TWO (2T GAUGES (0-15 PSI) PER PRODUCT
<br /> BEING TESTED.PERMITS -
<br /> (b) SOAP TESTING: 3633_ SEAPORT" BLVD.
<br /> 1. GENER • 'SOAP TEST SECONDARY PIPING USING THE SAME PROCEDURES AS WEST SACRAMENTO, CA 95691
<br /> 1. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES THAT ARE TO HOUTUNED ABOVE FOR THE PRIMARY PIPING OBSERVING FOR BUBBLES -
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR INDICATING LEAKAGE. DO NOT EXCEED PRESSURES INDICATED ABOVE. Phone: (91�) 372-1985 -
<br /> REPLACE, TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE, ANY • (SYSTEM SHOULD BE KEPT AT S PBI DURING COMPLETION - Fax:Pho (916) 372-0911
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS. OF SITE WORK, PANNE, CURSE, ETC.
<br /> 2. ALL EXCAVATIONS SHALL. BE PERFORMED IN COMPLIANCE WITH OSHA AND DEVELOPER:
<br /> STATE REGULATIONS, THE CONTRACTOR IS REFERRED TO THE OSHA BOOKLET, 5. VENTS, VAPOR, AND TANK RISER TESTING:
<br /> EXCAVATING AND TRENCHING OPERATIONS, FOR SAFE WORK PRACTICESITT. dR--RE$.`ESGERY-TsfPIRC-fTAV-90TRS'fnWN - - I�C�w
<br /> GUIDE' FOR PERFORMING EXCAVATION WORK. - - - . . n
<br /> (1) UPON COMPLETION OF VAPOR RECOVERY PIPING, TEST SYSTEM AS FOLLOWS; - - - G BI FZZINI
<br /> S. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE THE , W+fe l.. X11
<br /> OWNER WITH AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY THE (a) BEFORE APPLYING PRESSURE, VERIFY THE FOLLOWING HAVE BEEN COMPLETED: -
<br /> •FAQ
<br /> - CONTRACTOR. "AS BUIL18" SHALL BE COMPLETED ON-SITE. " VERIFY ALL FILL AND VAPOR CAPS HAVE BEEN SINGLY WIRED OR BOLTED
<br /> TO ENSURE THEY ARE NOT ACCIDENTLY REMOVED DURING TESTING. - - -
<br /> 4. CONTRACTOR SHALL PROVIDE A WORN SCHEDULE TO THE OWNER BEFORE THERE SHALL BE GAUGES 0-15 PSI
<br /> COMMENCING ANY CONSTRUCTION WORK. ' ( ) IN PLACE WITH A 5 PSI
<br /> RELIEF VALVE TO PR Ni OVER PRESUR12ATION OF TANKS
<br /> 5. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND • VERIFY Al CMS AND PLUGS HAVE BEEN TIGHTENED BEFORE TEST. a
<br /> SHALL OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES TOOLED 1 T/4" DEEP INTO SUB- REVISIONS
<br /> REQUIRED TO OPERATE THE FACILITY. (b) SOAP TESTING: TYPIl AL AT CONTROL JOINT -_ 14 REBAR AT 24" O.C. _
<br /> " 'SOAP TEST VAPOR RECOVERY & VENT PIPING USING THE SAME PROCEDURES EACH WAY (TYPICAL) NO DESCRIPTION DATE
<br /> AS OUTLINED ABOVE FOR THE PRIMARY PIPING OBSERVING FOR BUBBLES - -- --
<br /> 1
<br /> SCOPE C ff^�� DV INDICATING LEAKAGE. CHECK ALL TANK RISERS, TURBINES, AND MANWAY I CifY P4A0 e.NeCK 4-1 5�5/Op
<br /> SCOF WORK FOR SIGNS OF LEAKS.
<br /> �5i+E/15FF .�h'"II. C.Ll1rZi F/CAP 1011 I 3100
<br /> 1. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. AT THE END OF ' IREMOVE PRESSURE AFTER OBSERVING FOR ONE HOUR. .___-__ - -
<br /> EACH WORK DAY SECURE FENCING PANELS TOGETHER. • TDO NOT LEAVE TANKS UNDER PRESSURE FOR MORD I - - - - -- --
<br /> THAN 1 1/2 HOURS. - - 1 M I _
<br /> 2. WHEN EXISTING SITE IS BEING DEMOLISHED, FLUSH, CUT, AND REMOVE � - --
<br /> PRODUCT ONES FROM TANKS TO DISPENSER ISLANDS.
<br /> 6. DUE 70 WEATHER CONDITIONS, PRE88UIR0S MAY RIBS OR PALL OYER A - - I --- ---- - ----
<br /> PERIOD OF TIME. PRESSUR98 SHALL BE MONITORED AT REGULAR INTERVALS
<br /> 3. REMOVE ALL EXISTING FUEL DISPENSERS, IAS REQ, BARRICADES, FUEL LINES, TO PREVENT FALSE READINGS.
<br /> AND CONCRETE PAIN ASPHALT SURFACES AS REQUIRED, IN PREPARATION FOR --
<br /> INSTALLATION OF NEW EQUIP./MATERIAL AS SHOWN ON DRAWINGS, SEESITEPLAN FOR SPECIFIC APPLICATION 7. VENT AND VAPOR RECOVERY PIPING WITH PHASE 11 RECOVERY. �
<br /> 4. INSTALL. SHORING IN TANK HOLE AS REQUIRED (IF REQUIRED, AT EXTRA COST).
<br /> AND VAPOR
<br /> 5. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANKS. (1) PASSICONTNG ANY TOR (LOCALLY RESPOIIMPO ED TEST SIBLE FOR VERECOVERY PIPING SYSTEM
<br /> 6. THE OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF EXCAVATED 8. UPON COMPLETION OF THE FUELING SYSTEM, THE FOLLOWING TEEMS ARE REQUIRED: -
<br /> SOIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION. INCLUDING AERATION. (1) ST-27 TEST,
<br /> ELEVATION -
<br /> 7. INSTALL_ FILTER FABRIC LINER IN TANK HOLE PER DRAWINGS. (2) ST-30 TEST. -
<br /> 8. INSTALL TANKS AS SHOWN ON SHEET TL-1 AND PER MANUFACTURER'S (3) A over L 1LE5T (IF REQUIRED). + - DRAWINGS PREPARED FOR:
<br /> INSTRUCTIONS. TANK BEDDING AND BACKFILL SHALL MEET TANK MANUFACTURES. - (4) PLACED IN SERVICE REPORT. - DRIVE SLAB DETAIL
<br /> CONGUILR2ACTOR TON
<br /> NPROVIDE AEMIN. 1/4'L PER FOOT SLOPELINES. TAK BURY DPTH SHALBE CALCULATEDBONTALLGPPIINGENERALTO TANKS. (5) METER CALIBRATION, CONFIRMED AND ADJUSTED. (RESULTS MUST BE SENT TO WEIGHTS ''GALE• I' = I'-0" YOSEMITE
<br /> & MEASURES WITHIN 24 HOURS OF COMPLETION) - AVENUE
<br /> 9. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST. - (6) ALL METERS SEALED. - _ 5'-11" __ _ 8'-0" L
<br /> 10. INSTALL NEW FIBERGLASS PRODUCT, VENT & VAPOR LINES PER SITE PLAN, (7) TANK AND LINE TEST (3rd PARTY). SLOPE VARIES,
<br /> STANDARD TANK DRAWINGS, AND PER SCHEDULE BELOW: 1" MIN., SEE SHELL
<br /> (8) FUEL SYSTEM CHECK TEST. CIVIL TOOLED I i/4' DEEP INTO SLAB-
<br /> A. PRODUCT PIPING: 2" RED THREAD IIA AND RED THREAD it FITTINGS,
<br /> DS 8000 SERIES ADRESNE. (9) AS BUILT DRAWINGS, TYPICAL AT CONTROL JOINTS
<br /> -
<br /> B. VENT PIPING: SANE AS ABOVE (10) MONITORING SYSTEM FINAL WITH APPROPRIATE AGENCY APPROVALS. - - 15" EEAACH EWAY AT
<br /> 1,330 EAS( YOSEMITE AVENUE
<br /> C. VAPOR PIPING: SAME AS ABOVE WITH 2" AND 3' PIPING AS NOTED • THE ABOVE MENTIONED UST IS FOR REFERENCE ONLY. CITY, COUNTY, OR OTHER MANTECA CA 95336
<br /> CN PIANS. - GOVERNING AGENCIES, MAY HAVE OTHER REQUIREMENTS THAT MUST BE ADHERED TO --+---
<br /> D- SECONDARY 3' A.O. SMITH RED THREAD IIA PIPE AND FITTINGS. - IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM AND MEET ALL REQUIREMENTS.
<br /> PRODUCT PIPING - - ❑-E. STEEL PIPING: ALL PIPING OTHER THAN FIBERGLASS SHALL 13. ALL BLACK IRON PIPING TO BE PAINTED CROY. 0
<br /> BE BLACK IRON (GALVANIZED PIPE IS NOT --... SHEET TITLE
<br /> ALLOWED). ALL STEEL PIPE BELOW GRADE 14. ALL CONDUIT SHALL BE 3/4"(MIN). MIN, BURIAL AT 24' Ilk - --
<br /> SHALL BE DOUBLE WRAPPED WITH 10 MIL ��� ���
<br /> PVC TAPE. _. BOLLARD
<br /> 15 INSTALL MONITORING SYSTEM WITH LIQUID SENSORS CONTROL PANE TANK ANNULAR SPACE DETAIL 8/TL3
<br /> NOTE: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HhVING BEEN ANO IN TURBINE SUMPS. INSTALL MONITOR VEPRPANEL IN EXISTING BUILDING - 1 - GENERAL NOTES
<br /> TRA1NEp BY THE PIPING MANUFACNRER. AS DIRECTED BY OWNER. INSTALL LIQUID LEYEL PROBES IN TANKS. • ' AyL�A N.I Lw
<br /> 11. INSTALL NEW VENT RISERS AS SHOWN ON SITE PLAN. INSTALL SWING SEE SITE ELECTRICAL PLAN FOR TANK CONDUIT CONFIGURATION. - PLAN,
<br /> C.J.
<br /> JOINTS OR FLEX CONNECTORS AT BOTTOM OF VENT RISERS. - _
<br /> NOTE; IS SLAB DETAILS
<br /> SEE SITE PLAN FOR SPECIFIC APPUCATION -
<br /> DATE: 3/'74/00 SHEET NO.
<br /> PROD.$: -.00.-0201
<br /> DISPENSER ISLAND DETAIL & SCALE: AS SHOWN
<br /> GENERAL NOTES SCOPE OF WORK ADA ACCESS @ MPD/GARDREADER TANK SLAB DETAIL DRAWN �, � ' �
<br /> Lrr:SCN.E: 1/4 = 1 -0. ` SCALE: 1" = 1'-0" , . CHECKED