Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Cheeka! <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> Ell.CONTINUOUS ELECTRONIC MONITORING E 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER:Veeder-Root 490-55. MODEL#:TLS35 490-56. <br /> LEAK SENSOR MANUFACTURER: OPW 49(1-57. MODEL#(S . at&Chalo 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES E b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES E b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES E b.NO 49°-61' <br /> UDC MONITORING STOPS THE-FL O W OF PRODUCT AT THE DISPENSER. E a.YES ❑ b.NO 490-62. <br /> UDC CONSTRUCTION IS: E 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 49o-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490'646. <br /> VII."PERIODIC SYSTEM TESTING <br /> E I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTIONJEM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.I23 CCR§2644.11 <br /> E 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> E 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintmance records are kept for this facility: 490-68. <br /> E a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> E h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> E Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: 490-690- <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> E THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 4% 9b. <br /> E OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49"9c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490d9e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-698. <br /> [:14%49h.OTHER(Specify): 49M%. <br /> 13 This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a maturer consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provideyddi6ional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-91. <br /> X / XI. ;PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by tWUkn occurs;2.)all conditions that indicate a-possible release are investi&ated_and 3:),all monitoring records are maintained property_ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Pierre Chahoud 490.12 TITLE:Store Manager 490-73. <br /> NAME: George Sisson <br /> 490-04. TITLE:Zone Manager 49x75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR'SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77. <br /> January 5, 2010 <br /> MPRESEM G:®1.Tank Ownal or®2.FuilA (Tune/ or❑3.AuthotssN R ramtetive ofOuma 49046. <br /> APPLICANT NAME(print): 490-78. APPLICANTTITLE: 490-79. <br /> Paul Chevalier Maintenance Manager <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org <br />