General Notes
<br /> PIPING LEGEND
<br /> -_ =i -- - '-- - NEW 2' F.G. DOUBLE WALL PRODUCT PIPING
<br /> NEW 3" AND 2' F.0 SINGLE WALL VAPOR RECOVERY PIPING
<br /> - - EXISTING 2' F.C. SINGLE WALL VENT PIPING (LOCATIONS ASSUMED)
<br /> - - _— —
<br /> EXISTING NEW ,
<br /> \F
<br /> --+>F EXISTING/NEWCONDUIT (LOCATIONS ASSUMED)
<br /> X PIPING OR CONDUIT INTERCEPT POINT (CONTRACTOR TO DETERMINE)
<br /> THE GENERAL CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS PRIOR TO BID SUBMISSION.
<br /> IlJ 2, ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK.
<br /> ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE W
<br /> PROCEEDING WITH THE WORK. 0�y
<br /> P/L 173.68' - 3 INSTALLATION
<br /> THE STATE AND LOCAL REQUIRING EMENT. SHALL BE CONTRACTOR SHALMED BY A L PROVIDELICENSED NOTIFCATIONKTOERVICE PROVIDER AS THE JURISDICTIONAL REQUIRED �„!
<br /> AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING TO THE PERMIT REQUIREMENTS cd rC) O
<br /> 16" HIGH CONCRETE BLOCK WALL LL] 4. ALL ELECTRICAL WORK PERFORMED WITHIN CLASS I HAZARDOUS AREAS SHALL BE SEALED PER NEC AND DEC
<br /> HIGH RISE SIGN
<br /> REQUIREMENTS.
<br /> 5. THE PRODUCT PIPING LAYOUT SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT [�'' MW-' 0
<br /> INTENDED TO BE AN EXACT REPRESENTATION OF THE PIPING LAYOUT. GENERAL CONTRACTOR TO RELOCATE, 'y�'CInC `�•✓
<br /> _ MODIFY AND ADJUST PIPING INSTALLATION TO PROVIDE A SYSTEM CONSISTENT WITH THE INTENT OF THE DESIGN. AAAA...wuuu. 4!/ ry
<br /> GENERAL CONTRACTOR SHALL PREPARE "AS-BUILT" PLANS UPON THE COMPLETION OF THE INSTALLATION. 0 C 0 I„
<br /> 6. ALL UNDERGROUND PIPING SHALL 6E FIBERGLASS UNLESS NOTED OTHERWISE AND 5144LL BE INSTALLED PER �F W
<br /> L 7.SEPTIC MANUFACTURERS SPECIFICATIONS.
<br /> 9 TANK THE GENERAL CONTRACTOR SHALL INSTALL ALL EQUIPMENT REQUIRED FOR COMPLETE INSTALLATION
<br /> ®,
<br /> TION WHETHER OR �-.B.
<br /> - L- _j NOT THE EQUIPMENT IS PROVIDED BY OWNER OR OTHERS. S"3
<br /> - - - - - - - - - - - - - - - - - - - - -- - -- MONITORING B. GENERAL CONTRACTOR SHALL CONDUCT THEIR WORK IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL P✓i1 C C"
<br /> T_ WELL- - - - - -- - - - - - - - - - - - - - -- _�\\ WELL LAWS AND REGULATIONS. W9 0 ( o
<br /> — — — — — — Installation Noes -- "'meqq" c �Uy
<br /> TANK VENTS ( EXISTING (2) 12,000 GALLON WENS CORNING SINGLE WALL FRP TANK TO BE REMOVED AND REPLACED NTH 15,000 GALLON ..J
<br /> \ XERXES O UBLE WALL FIBERGLASS TANK. SEE DWG. TKI-28. •� (H
<br /> \\ EXISTING (1) 10,000 GALLON OWENS CORNING SINGLE WALL FRP TANK TO BE REMOVED AND REPLACED WITH 12,000 GALLON VJ
<br /> \\\ XERXES DOUBLE WALL FIBERGLASS TANK. SEE DWG. TK7-2A. CONFIGURE PRODUCTS AS FOLLOWS: ,+•� /''\
<br /> _ _ NEW MIDGRADE 15,000 GALLON 09 OCTANE (TTANE (ANK N1�.TA 3A�NEW UNLEADED 15,000 GALLON 67 OCTANE (TANK 12) r e 0
<br /> 12 19 I EQUIP. \\ MONITORINGNEW DED 94DPALARMM SYS EM.000 9TANKS TO BE SET AfI 48" BELOW. TANKS 70 EFINISH GRADE. STLL NEW TURBINE AND0 TANK FILL SIDESUMPSPIPING
<br /> �.n y--•
<br /> 17 1 I 14 e ENCLOSURE \\\ ON ALL TANKS. TANK INSTALLATION PER MANUFACTURER'S INSTRUCTIONS a, /c �J
<br /> I, P) MOPS/BUCKETS 0 INSTALL A 6' REINFORCED CONCRETE SUB OVER TANKS. SET MANHOLE COVERS I� IN
<br /> f1-1/2" ABOVE SALAD SEE DETAIL ,118 ON DWG. TK3-5. ( yyq �•V
<br /> �o Y i I 12 5 P 4 1 3 INSTALL THREE (3) 4" DUAL POINT FILLS. SEE DINGS. TK1-2A & TKI-28. \ •1'-'`r 0
<br /> _sO ® INSTALL THREE (3) 3" DUAL POINT STAGE I VAPOR RECOVERY FRTINCS. SEE DWGS. TK1-2A & TKI-2B. W V/
<br /> 10 _ EXISTING � INSTALL NEW 1-1/2 HP STANDARD TURBINES IN ALL TANKS. TURBINES SHALL BE EQUIPPED WTH 3 GPH MECHANICAL LEAK DETECTORS.
<br /> ARCO AM/PM CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND ROUTE EXISTING CONDUITS TO NEW TURBINE LOCATIONS W
<br /> 16 71 w PUI L NEW WIRE FROM PANELBOARD TO SERVE NEW TURBINES. CHECK CIRCUIT BREAKERS IN PANEL FOR LOAD SERVICEABILITY FOR
<br /> © 0 NEW TURBINES, REPLACE IF NEEDED. ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION ,,,,q✓
<br /> 1\ �L NEW 0 AND TO ALT. LOCAL REQUIREMENTS. NOTE THAT EXISTING CONDUIT LOCATIONS ARE ASSUMED. MC11
<br /> 10 12 \ �� I , VEEDER ROOT © INSTALL 3" SINGLE WALL STAGE II VAPOR RECOVERY LINE FOR "BALANCE' VAPOR RECOVERY SYSTEM.
<br /> 10 NEW
<br /> 1 I ALARM MONITOR SLOPE 1/8" PER FOOT MINIMUM TO TANKSTEM . SEE DETAILS AND SECTIONS ON DWG. D(3-3.
<br /> ( _ o - cd
<br /> 5 EMERGENCY PUMP INSTALL THREE 2" DOUBLE WALL PRODUCT LINES. LINES TO BE EQUIPPED WITH UWID LEAK MONITOR SENSOR
<br /> 37373737 (S(HUTOFF SWITCH IN PIPING SUMP ATTAKS. ACpHED 10 TANK AND WIRED FOR TURBINE SHUT DOWN. SLOPE 1/8' PER FOOT MINIMUM i0
<br /> --� jO DOOR RE AIN OUTDOOR) (AIR/WATER PIPING SHALL EAINS4AL ON
<br /> PER MANUFACTURERS RECOMMENDATION AND INSTRUCTIONS, FOR WIRING DIAGRAM.
<br /> 3 4 I �{
<br /> 8. 0 12 15 i l— cd
<br /> �1 17 - QB INSTALL 'VEEOER ROOT' TANK AND LINE ALARM CONTROL PANEL MODEL JI TLS-350 IN BUILDING //��
<br /> -��,� I ! SEE DRAWING TK4-1 FOR LEAK DETECTION AND DISPENSER WIRING DIAGRAM. W
<br /> 4 3 2 1 J c2 10 12 1 5 5
<br /> q__ //,o, Y __ __ _ j <9 INSTALL NEW THREE (3) 2" SINGLE WALL FIBERGLASS VENT LINES FROM TANKS TO NEW VENT RISERS AT BUILDING. CONTRACTOR TO t�{I.(J
<br /> `� �� ` _�.H 11 1 VERIFY THAT THE TERMINATION POINT OF EXISTING TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE, 30 INCHES ABOVE ROOF I
<br /> LINE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY UNE THAT CAN BE BUILT UPON AND IN ACCORDANCE
<br /> C I I NEW UI EXISTING CONDUIT
<br /> TO BUILDING WITH UNIFORM FIRE CODE REQUIREMENTS. SEE DETAIL M4 ON DRAWING TK3-1.
<br /> ELECTRICAL PANEL 10 INSTALL THREE (3) ANNULAR SPACE MONITOR PROBES. SEE DWGS, TKI-2A & TK1-28.
<br /> �I SEE DETAIL #2 0ON DWG TK4-2.
<br /> (TYP.) 14 3 4 17 ,ill71.
<br /> INSTALL BALL FLOAT VALVE/EXTRACTOR ASSEMBLY FOR VENT & STAGE II VAPOR RECOVERY.
<br /> 12 15 f�I SEE DWGS. TKI-2A & TK -2B. SEE DETAIL #5 ON DWG TK3-1. \
<br /> REF. 6 IL II7 6 - 12 SEE DRAWING TK4-2 FOR MONITORING CONDUIT DETAIL AND SENSOR AND PROBE MOUNTING DETAILS.
<br /> 32 -5' I If
<br /> - - 13 NOT USED.
<br /> 14 INSTALL FOUR (4) INSPECTION/MONITORING WELLS AS SHOWN. SEE DWGS. TK7-2A AND TK7-',B
<br /> III j 23 \I ; i °� ; i, 23 15 FOR IDENTIFICATION MARKINGS AT TANK MANHOLES, SEE DETAIL 120 ON DWG. TK3-5.
<br /> 16 INSTALL 2" DIA. INACTIVE SIPHON BETWEEN 87 OCTANE TANK AND 89 OCTANE TANK AS SHOWN.
<br /> I SEE DETAILS R6, k7 ANO ,>/8 ON DWG. TK3-2.
<br /> �- 22 21 22 17 INSTALL STATIC GROUNDING SYSTEM AS PER DETAIL ,E4 ON DWG TK4-2.
<br /> 6 (aj) CONTRACTOR TO BACKFILL EXCAVATION WITH PFAGRAVEL IN 12' LIFTS. REUSE OLD BACKFILL
<br /> NEW PIC 25 IF
<br /> N.
<br /> 24 UNIT 19' NOT USED:
<br /> 25 EXISTING PIC '^
<br /> UNIT 20 CONTRACTOR TO PATCH EXISTING CONCRETE DRIVE E SLAB AND REINFORCING. CONTRACTOR TO INSTALL NEW TANK SLABS AND REINFORCING.
<br /> 22
<br /> CONTRACTOR TO DOWEL INTO EXISTING CONCRETE DRIVE SLAB AT PIC UNITS W/ #4' x 18" STEEL BARS AT I6" O.C. „ m
<br /> 22 SEE DRAWING TK2-1.
<br /> 7 6 21 CONTRACTOR TO TOUCH-UP/REPAIR ANY DAMAGE TO CANOPY COLUMNS FROM THE INSTALLATION OF NEW PIC UNIT AS REQUIRED. `V -a��.... w
<br /> - 22 CONTRACTOR TO REINSTALL (4) FOUR GILBARCG 621 & (4) B43 QUAD, SINGLE HOSE PER SIDE, PRODUCT DISPENSERS c
<br /> AS SHOWN. DISPENSERS TO BE FITTED WITH BALANCE STAGE 11 HOSES AND NOZZLES BREAKAWAY VALVES AND
<br /> II UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES ANIS MONITORING SENSORS. L^
<br /> SEWER ❑ i' 23 �I X "- a 0 X d, 9„ 23 SEE DWGS. TK3-3 AND TK3-4 FOR TYPICAL INSTALLATION DETAILS. E
<br /> SUMP - --- - - CONTRACTOR SHALL FIELD LOCATE, INTERCEPT AND CUT EXISTING CONDUIT ROUTED TO REMOVED f yV r
<br /> cd
<br /> DISPENSERS AT A CONVENIENT LOCATION. REMOVE ALL WIRING BACK TO PANEL, CAP AND ABANDON .mS. cd /^�
<br /> cd
<br /> ALL CONDUITS NOT BEING REUSED. CHECK CIRCUIT BREAKERS IN PANEL FOR LOAD SERVICEABIUTY �"� l.Ll ,C W W
<br /> O DRY SUMP T TO THE DISPENSERS REMOVE ALL BREAKERS NOT BEING REUSED. REPLACE BREAKERS IF NEEDED. IS F�-
<br /> LOT LIGHT ALL ELECTRICAL WORK SHALL CONFORM TO THE UNIFORM ELECTRICAL CODE 1994 EDITION AND TO ALL yy _
<br /> O DRY SUMP LOCONEACONDUIT SHALL USEDNCIrE THAT FOR NEWTING DISPENSERTPOWERTIONS ARE ASSUMED. EAND COMMUNICATION AND ONE CONDUIT FOR DISPENSER -P-- mg
<br /> INTERCOM. REROUTE CONDUIT AT BUILDING TO ACCOMMODATE INTERCOM LOCATION AT SALES COUNTER. VJ
<br /> R/W DISPENSER START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH 200 GALLONS PER HOSE '�^{� � U O C
<br /> 1.34 21'-6'
<br /> SUMP MINIMUM. PITY AIR POCKETS BR gTART pP PROBLEMg DUE To IMPROPER INSTALLATION OR INCORRECT WIRING THAT q
<br /> ❑ DESTNOYS ELECTRONICS WILL BE BILLED BOCK TO TILE CONTRACTOR. c: �{ � o
<br /> .J o LOT LIGHT
<br /> CORNER CONTRACTOR TO INSTALL (4) NEW ISLAND BUMPER POSTS. SEE DETAIL /16 ON DWG. TK3-4.
<br /> j RAN 167." I.D. SIGNCONTW 'N yyy�ryryrycd
<br /> O 24 DAMAGEDOR TO ASPHALT ASPHLTAONNAND STE. REPAIR ALL SAWCUT CLEAN LLT AFFECTED BY THE NEW TANK AND L ADJACENT ASPHALT N REPAIR AREASIPING BEFORE TALLATION A PATCHING.ANOALL SLURRYTHER
<br /> 7. T�&b COAT ALL ASPHALT ON SITE AND RESTRIPE PARKING SPACES. W m � C(U�
<br /> d
<br /> Q � 25 EXISTING PIC (PAY ISLAND CASHIERS) TO REMAIN. INSTALL NEW DOUBLE SIDED PIC LINT AT INSIDE ISALND.
<br /> ;z, �04� --------- -- --_ —_------ Compliance Notes
<br /> H V GENERAL CONTRACTOR SIIALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY STATE OF CALIFORNIA) .� q
<br /> U FOR EXCAVATIONS OF TRENCHES 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO ESCEND.
<br /> ��../��`�I pp�q( GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY PRIOR TO ANY REQUIRED INSPECTIONS.
<br /> g rA�••� BLVD. TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT THREE (3) SEPARATE CONSTRUCTION 2 ?
<br /> 11
<br /> (STATE PHASES AS REQUIRED: SL P9'
<br /> 6VJ �y�A/� ®� 1. TANK AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. CrZNQ ENGIHF.�'
<br /> ' 1 �/� U A7 j�O 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITI4 MANUFACTURER'S GUIDELINES.
<br /> 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM..
<br /> 14N0 PUNNING ANO DESIGN SRECVL515'
<br /> h� DA Oh Q M1 N 92 ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LIKE TEST) WfTH 18215 72ND AVENUE SOUTH
<br /> y STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT, THE OWNER'S KENT, WASHINGTON 98032
<br /> y� GI8865 ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PALO. (206) 251-6222
<br /> J 7 TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING F^,6, i
<br /> Q ( C� AGENCY PRIOR 10 TANK SYSTEM BEING PLACED IN OPERATION. BCE# 3518
<br /> 0 o F 'REN.&21/ �U� Cell Toll Free ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE 1MENDED PURPOSE AS
<br /> Of NS X� PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORTRES. Mosier release de{e
<br /> CL en nRc� rl� 1-800-422-4133
<br /> OL 2 -
<br /> OL
<br /> TWO NO. ARCO PRODUCTS COMPANY MASTER REVISIONS
<br /> Of WORKING DAYS
<br /> BEFORE YOU NO. DATE REVISIONS PROJECT RELEASE prof, axe. drawn by
<br /> DLG � /19/99 REVISED FOR ALL NEW TANKS PER ARCO ISSUED FOR
<br /> 3/31/99 SHK
<br /> g 4/29/99 REVISED PER ARCO DISTRIBUTION-ROTATED TANKS PLAN CHECK 3/31/99
<br /> Underpround 9CAW" Alert 2 / / project j facility
<br /> 0 10 20 w of SoutAern CeYtonYa /12/99 REVISED PER ARCO DISTRIBUTION-ROTATED TANKS BID 3/31/99
<br /> Underground Tank Retrofit and Piping Installation As-Built Site Plan 3 RELEA8E 6020
<br /> w REVISED FUELING CONFUGURATION PER ARCD
<br /> CONST. sheet / file
<br /> Li 3 SCALE: I" = 10'- 0" ( IN FEET ) 4Q /9/99 PIPING AS-BUILT FOR SAN JOAOUIN CO ENV HEALT RELEASE TK1-1
<br /> s
<br /> W = 1 inch =10 [t. AS-BUILT
<br /> of
<br /> r:r.- DA Cl`cVPPn l\ iSlA LArPWeulrnl\TAkite c\ ir.t PTV 11 a CRI III T nWC I1M.JT;—. 1RIA011000 1557 Zi. I=R.n nI.— 1—I.
<br />
|