Laserfiche WebLink
0 0 <br /> F. In-Tank Gauging/SIR Equipment N Check this box If tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> N Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> N Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> N Yes ❑ No' Was accuracy of system product level readings tested? MAY 2015 <br /> N Yes ❑ No' Was accuracy of system water level readings tested? <br /> N Yes ❑ No. Were all probes reinstalled property? L—WHONME L <br /> N Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? HF.A)TN nmat7TAAr <br /> `In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> N Yes ❑ No' For equipment start-up or annual equipment certffication, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: N 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> N Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> N Yes ❑ No' Was the testing apparatus property calibrated? <br /> N Yes ❑ No' For mechanics[LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off ff the LLD detects a leak? <br /> N N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> N N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> N N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N N/A <br /> N Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> •In Section H,below,describe how and when these deficiencies were or will be connected. <br /> H. Comments: <br /> 87 120 2 25 19 PASS <br /> 91 130 5 27 21 PASS <br /> Monitoring System Certification Page 3 of 2/21/07 <br />