My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2300 - Underground Storage Tank Program
>
PR0231458
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 4:47:19 PM
Creation date
11/7/2018 12:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231458
PE
2361
FACILITY_ID
FA0001196
FACILITY_NAME
SAVE ON FUEL
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
219-312-06
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\420\PR0231458\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
5/22/2018 4:08:03 PM
QuestysRecordID
3898484
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F,- In-Tank Gauging/SIR Equipment: ® Check this box if tank gafing is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is irfsitalletl. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring, a•r f"`may,r-- a <br /> Complete the following checklist: M■G. .■VE V <br /> ® Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No' Was accuracy of system product level readings tested? <br /> ® Yes ❑ No' Was accuracy of system water level readings tested? <br /> 4C '"U'1CDd pTlrlCklT <br /> ® Yes ❑ No' Were all probes reinstalled properly? <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,tlescribe how and when these deficiencies were or will be contacted. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the following checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: 03 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 87 120 2 25 19 PASS <br /> 91 130 5 27 21 PASS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.