My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2300 - Underground Storage Tank Program
>
PR0231458
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 4:47:19 PM
Creation date
11/7/2018 12:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231458
PE
2361
FACILITY_ID
FA0001196
FACILITY_NAME
SAVE ON FUEL
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
219-312-06
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\420\PR0231458\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
5/22/2018 4:08:03 PM
QuestysRecordID
3898484
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging 1 SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> [IMentry Has all input wiring been inspected for proper entry and termination,including testing for ground faults?Were all tank gauging probes visually inspectetl for damage and residue buildup?Was accuracy of system product level readings tested? 2'Was accuracy of system water level readings tested? w\` Were all probes reinstalled properly? M' Were all items on the equipment manufacturer's maintenance checklist completed? t [)EpD' <br /> `In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com Tete the followin checklist: <br /> ® Yes ❑ No* For Simulated <br /> leak rate: ®3r annual equipment <br /> er ffiicationn,hwas a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A <br /> ® Yes [3 No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ NOW Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No` For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No` For electronic LLDs,have all accessible wiring wnnections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No` Were all items on the equipment manufacture s maintenance checklist wmpleted7 <br /> In Section H,below,describe how and when these oenciencies were or will be corrected. <br /> H. Comments: — <br /> Monitoring System Certification <br /> Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.