Laserfiche WebLink
SWRCB,January 2002 • • Page /b of,� <br /> S. FILL MER CONTAINMENT SUMP TESTING <br /> Facili is Not ed With Fill Riser Containment Sum s <br /> Fill Riser Containment Sumps are Present,but were Not Tested U <br /> 1to Method Developed By: U Sump Manufacturer U industry Standard U Professioaal Engineer <br /> U Other(Sped ) <br /> Test M U Pressure U Vacuum U Hydrostatic <br /> U Other <br /> TestEquipmcatOscd: Equipment Resolution <br /> FILL Sum # FW Sum # FLLI SumP# FILL Sum t! <br /> Diameter. <br /> Height from Tank Top to Top of <br /> Iii est Piping Pepetration: i <br /> Height from Tank Top to Lowest / <br /> Electrical Penetmfida: <br /> Condiuoh of sump prior to <br /> rerun : \ <br /> on cifsurnp Tested <br /> Material: <br /> Wait time between appiying <br /> presswelvacuumtwater and <br /> startin test: <br /> Tort Start Time: <br /> Initi .Readin <br /> Test End Time: / <br /> fast Ite'adin <br /> TcstDuration: <br /> Chan !n Ree ' <br /> PasslFail Threshold'm Criteria' <br /> fs these i soasor in the MIPO U Yes U No U Yes U No U Yes U No U Yes U No <br /> Does the sensor a en U Yes U No U NA <br /> 'either product or is U Yes U No U NA U Yes U No U NA U Y U No U NA <br /> detected? <br /> Was sons moved for testing? U Yes U No U NA U Yes U No U NA U Yes U No U NA U Yes U o U NA <br /> Was nsor properly reptaced and U Yes U No U NA U Yes U No U NA U Yes U No U NA U Yes U No <br /> ed fimctlonai after ter ' ? <br /> Comments paclude NLb marion on repaln made prlpr to fesf ng and rec mmended foflo�upfar failed rertrJ <br />