Laserfiche WebLink
• 0 Page & of <br /> SWRCB,January 2002 <br /> 9. SPILLIOVERFILL CONTAINMENT BOXFS <br /> Facility is Not EquippW With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ;professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used Cwt Idwe!/ Ls+'�L-Gt+a« �N�1 s"� Equipment Resolution: S <br /> Spill Box 45-F Spill Box#(�- Spill Box# Spill Box# <br /> Bucket Diameter: 1't <br /> Bucket Depth: r'4 <br /> Wait time between ling <br /> pressure/vacu ter d <br /> StarUn test: t0/"t rwW-fig W M wA4A5 - <br /> Test Start Time: o g 9.0 J <br /> Initial Reading(Ri): %:tV j,4-Cr f-rvs+Grvr t2 <br /> Test End Time: <br /> Final Reading(RF): -x00-44 4A.0- <br /> Test <br /> A.¢Test Duration: 30 yr nwt k 30 01 W <br /> Change in Reading(RF-RO d N o 6,"G^ <br /> Pas slFail Threshold or <br /> Criteria: o s�3 n m n.,v 5301»n^ <br /> Test Result: �gass ❑Fail Pass 13 Fail [I Pass 11 Fail <br /> ❑ Pass ❑ Fall <br /> Comments (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />