Laserfiche WebLink
F. In-Tank Gauging f SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control, <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the folio ing checklist: <br /> —01 es ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Y g ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> CJ'Y,w ❑ No* Was accuracy of system product level readings tested? <br /> eEL1 <br /> ❑ No's Was accuracy of system water level readings tested? <br /> Y No* Were all probes reinstalled properly? <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when <br /> �these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): 3 Check this box if LLDs are not installed. <br /> Corn a the folio ing checklist: <br /> es ❑ No* For equipment start-up or annual equipment rtification, was a leak simulated to verify LLD performance? <br /> © NIA (Check all that apply) Simulated leak rate: 13 3 g.p.h.; Cl 0.1 g.p.h; ❑0.2 g.p.h. <br /> Ef Xs ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Nps'' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> CYN/A <br /> ❑ Yes ❑phi* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> p'NIA or disconnected? <br /> Yes QIA o* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> NIA or fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> U NIA <br /> Lg�LesCl Noy` Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 a3rat <br />