My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0231459
>
COMPLIANCE INFO 1994 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 1:43:59 PM
Creation date
11/7/2018 12:24:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2009
RECORD_ID
PR0231459
PE
2361
FACILITY_ID
FA0003677
FACILITY_NAME
DIAMOND GAS AND FOOD MART
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
01
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0231459\COMPLIANCE INFO 1994 - 2009.PDF
QuestysFileName
COMPLIANCE INFO 1994 - 2009
QuestysRecordDate
2/16/2017 6:45:24 PM
QuestysRecordID
3339010
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging f SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control, <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the folio ing checklist: <br /> —01 es ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Y g ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> CJ'Y,w ❑ No* Was accuracy of system product level readings tested? <br /> eEL1 <br /> ❑ No's Was accuracy of system water level readings tested? <br /> Y No* Were all probes reinstalled properly? <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when <br /> �these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): 3 Check this box if LLDs are not installed. <br /> Corn a the folio ing checklist: <br /> es ❑ No* For equipment start-up or annual equipment rtification, was a leak simulated to verify LLD performance? <br /> © NIA (Check all that apply) Simulated leak rate: 13 3 g.p.h.; Cl 0.1 g.p.h; ❑0.2 g.p.h. <br /> Ef Xs ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Nps'' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> CYN/A <br /> ❑ Yes ❑phi* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> p'NIA or disconnected? <br /> Yes QIA o* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> NIA or fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> U NIA <br /> Lg�LesCl Noy` Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 a3rat <br />
The URL can be used to link to this page
Your browser does not support the video tag.