Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped vVith Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested d <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Water,Tape Measure Equ pment Resolution 1/16" <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> REGULAR FILL PLUS FILL PREMIUM FILL REGULAR VAPOR <br /> Bucket Diameter: 12 12 12 12 <br /> Bucket Depth: 14 14 14 14 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1040 1040 1040 1140 <br /> Initial Reading(RD: 12.5 13 13 12 <br /> Test End Time: 1140 1140 1140 1240 <br /> Final Reading(RF): 12.5 13 13 12 <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Comments— (include information on repairs madeprior to testing, and recommended follow-up for failed tests) <br /> ■ <br /> F�1 1 i 70'4 <br />