Laserfiche WebLink
INTEGRITY TANK TESING SERVICES P. O. BOX 69131PSTOCKTON, CA 95269 <br /> HORNER EZY CHEK PRECISION LINE TEST WORKSHEET <br /> OWNER/OPERATOR � C / SITE AGENT; � <br /> ADDRESS � '/� f%V �Y �✓� � TELEPHONEd - <br /> LINE CONNECTED TO TANK# �' l^ LINE HAS PLLD(� NO SUCTION LINE <br /> LINE DISPENSES APPROXIMATE LINE LENGTH 5_0 FEET <br /> TURBINE MAKEDISPENSER #1 MAKE . <br /> TANK TEST EQUIPMENT TO BE IN PLACE DURING LINE TEST (�jD NO <br /> LINE TO BE TESTED WITH LINE BLOCK IN PLACE OF PLLD NO <br /> TURBINE OUTPUT PRESSURE 97 fir' PSI TEST PRESSURE TO BE '7-� PSI <br /> TEST PRESSURE APPLIED AT f HOURS IMMEDIATE LINE DROP OFLINES <br /> TIME 'LINE SRT LINE END X.0037 RESULTS EST GPH MONITOR ACCUM. GPH TEST <br /> c. ¢ g 0 <br /> l <br /> ln�21 ;F& <br /> LINE INCREASE WHEN PRESSURE REMOVED TOTAL GPH <br /> BASED UPON CURRENT STANDARDS THE GPH DATA AS SHOWN ALLOW DO NOT ALLOW <br /> THE LINE TO BE CONSIDERED TIGHT. <br /> RED JACKET PLLD ASSURANCE TEST CONDUCTED WITHATISFACTO Y <br /> RESULTS. <br /> REMARKS:REMARKS: <br /> 8 Z- 2-7 <br /> TECHNICIAN LICENSE NUMBER TEST DATE <br /> STOCKTON (209) 474-1375 TOLL FREE (800) 262-8378 <br />