Laserfiche WebLink
.-� - • .. r4••r�,.��.:�-++.����..�J�r�.1u��.� -.-.� �._.r�.•.•.`.a..•�-.•-u.J�+J'�n r�....�...�.�r .�--.tiu-r..-.Ju.M-...�.•.- •�...�...�.....s`s.....+a <br /> f <br /> ' SOIL BORING LOG <br /> ' PROJECT NAME: POSDEF Power Company SOIL BORING ID: SB-1 <br /> SITE ADDRESS: 2526 West Washington Street SOIL BORING TOTAL DEPTH(feet): 5 <br /> Stockton,California SOIL BORING DIAM.(in): 2 <br /> DATE STARTED: 9/9/98 DRILLERICOMPANY: Spectrum Exploration, Inc. <br /> DATE COMPLETED: 9/9/98 Stockton, California <br /> GEOLOGIST/ENGINEER: Joseph Ramage, R.G.#5856 <br /> DRILLING METHOOD: Hand Auger Rama a Environmental <br /> O <br /> m m " <br /> = J W a h a <br /> CL m a U) F <br /> w <br /> 0 N = a DESCRIPTION p <br /> 0 0 <br /> CONCRETE: 16-inches thick <br /> 1 1 <br /> 2 2 <br /> ' SP SAND: Poorly-graded fine sand, light brown, dry, no odor. <br /> 3 3 <br /> 4 4 <br /> ' 5 SB-1-5 NA 5 <br /> GP PEA GRAVEL: Poorly-graded fine gravel,gray, dry, no odor. <br /> ' 6 6 <br /> 7 7 <br /> Terminated boring at 5 feet bgs. Sealed borehole with neat cement. <br /> ' 8 8 <br /> 9 g <br /> ' 10 10 <br /> 11- 11 <br /> 12 12 <br /> 13 13 <br /> 14 14 <br /> 15 15 <br /> 16 16 <br /> 17 17 <br /> 16 16 <br /> 19 19 <br /> 20 20 <br />