Laserfiche WebLink
SOIL BORING LOG <br /> PROJECT NAME: POSDEP Power Company SOIL BORING ID: SB-1 <br /> SITE ADDRESS: 2526 West Washington Street SOIL BORING TOTAL DEPTH(feet): 5 <br /> Stockton,Califomia SOIL BORING DIAM. (in): 2 <br /> DATE STARTED: 9/9!98 DRILLER/COMPANY: Spectrum Exploration, Inc. <br /> DATE COMPLETED: 9/9/98 Stockton,California <br /> GEOLOGISTIENGINEER: Joseph Ramage, R.G.#5856 <br /> DRILLING METHOOD: Hand Auger Ramage Environmental <br /> O <br /> LL <br /> d <br /> WK to LL <br /> = J W a to S <br /> am g <br /> U) a <br /> IL f C U ku <br /> Lu <br /> 0 z a DESCRIPTION o <br /> 0 0 <br /> CONCRETE: 16-inches thick <br /> 1 i <br /> 2 2 <br /> SP SAND: Poorly-graded fine sand, light brown, dry, no odor. <br /> 3 3 <br /> q 4 <br /> 5 SB-1-5 NA 5 <br /> GP PEA GRAVEL: Poody-graded fine gravel,gray,dry, no odor. <br /> fi fi <br /> 7 7 <br /> ' Terminated boring at 5 feet bgs. Sealed borehole with neat cement. <br /> 8 6 <br /> 9 9 <br /> 10 10 <br /> tt- it <br /> 12 12 <br /> 1 13 13 <br /> 14 14 <br /> 15 15 <br /> 16 16 <br /> 17 17 <br /> 18 iB <br /> 19 19 <br /> 20 20 <br />