Laserfiche WebLink
0I <br />`/ STATE OFCAUFORMA <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />ACOMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT <br />B. MANUFACTURED BY: <br />5 CHANGE OF INFORMATION <br />❑ 7 PERMANENTLY CLOSED ON SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT <br />❑ <br />6 TEMPORARY TANK CLOSURE <br />❑ S TANK REMOVED <br />CJ <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: t7 713 z <br />hLv K <br />❑ 2 STAINLESS STEEL <br />I_ TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN <br />A. OWNERS TANK I. D.# S <br />B. MANUFACTURED BY: <br />C. DATE INSTALLED(MO/DAYNEAR) ( p, <br />D. TANK CAPACITY IN GALLONS: loed <br />II_ TANK CONTENTS IFA.I ISMARKFO_ COMPLETFITEMC. <br />A. L!Tl MOTOR VEHICLE FUEL ❑ 4 OIL <br />B. <br />C. ❑ la RNEGEUULDAEROn <br />LH -JI <br />4 DIOL DIESEL ❑ S AVIATIONGAS <br />F-12 PETROLEUM ❑ 80 EMPTY <br />PRODUCT <br />1b PREMIUM <br />B. TANK <br />❑ ]METHANOL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />UNLEADED <br />MATERIAL <br />J <br />L(DESCRIBE <br />❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />❑ 2 LEADED <br />❑ <br />99 OTHER IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. R: <br />III. TANK CONSTRUCTION MARKONE ITEM ONLY IN BOXESA.B.AND C. AND ALLTHAT APPLIES INBOX D AND <br />A. TYPE OF <br />1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) <br />❑ 99 OTHER <br />B. TANK <br />1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEELCLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ B 100. METHANOL COMPATIBLE WIFRP <br />(PAmaryTank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />D. LEAK DETECTION <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />�9#'ONKNOWN <br />❑ 99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO— <br />D. CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONEUNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EOUIPMENT INSTALLED(YEAR) <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND. BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />A <br />1 SUCTION <br />A U <br />2 PRESSURE <br />A U <br />3 GRAVITY <br />A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL <br />A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />CORROSION <br />PROTECTION <br />A Y <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A 3LN3 <br />6 CONCRETE ACI <br />10 CATHODICP OTECTION <br />POLYVINYL CHLORIDE (PVC) A U <br />7 STEEL W/COATING A U <br />AU 95 UNKNOWN A U <br />4 FIBERGLASS PIPE <br />B 100% METHANOL COMPATIBLE W/FRP <br />99 OTHER <br />D. LEAK DETECTION <br />❑ 1 <br />AUTOMATIC LINE LEAK DETECTOR EZr 2 LINE TIGHTNESS TESTING ❑ <br />MONITORING <br />[:] 99 OTHER <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK ❑ !,JWENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 96 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO ❑ <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />(PRINTED A SIGNATURE) <br />1 ArAl AACMIMV IIQC INTI V <br />FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED, <br />LWA <br />FOR99kBry / <br />�r Inc rwn n�mocw ocwn <br />COUNTY# <br />JURISDICTION # <br />FACILITY # <br />TANK# <br />STATE I. DA <br />3 9 <br />J <br />O <br />PERMIT NUMBER <br />PERMIT APPROVED BY/DATE <br />PERMIT EXPIRATION DATE <br />FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED, <br />LWA <br />FOR99kBry / <br />