Laserfiche WebLink
D. Alternate cons t on for new underground storage tanks conteng motor vehicles fuel [Section 2633], <br /> (1) Monitoring and response plan [Section 26347. <br /> (2) Underground storage tank composed of.... <br /> (a) Fiberglass reinforced plastic. <br /> (b) Cathodically protected steel. <br /> (c) Steel clad with fiberglass reinforced plastic. <br /> (d) Other material that complies with section 2631 and 2632. <br /> (3) Floor of leak interception and detection system constructed on a firm base and sloped to a <br /> collection sump (use of membrane Liners comply with section 2631 (d) (6) requirements.) <br /> (4) Access casings installed in the collection sump of the secondary containment system with <br /> backfiLl in the interstitial space. The access casing shall meet all of the following: <br /> Designed and installed to allow the liquid to flow into the casing. <br /> sized to allow removal of collected Liquid and able to withstand aLL anticipated applied <br /> stresses, <br /> Constructed of material that will not be structurally weakened. <br /> screened along entire vertical zone of permeable material. <br /> Capable of preventing leakage of any hazardous substance from the casing. <br /> Extend to the ground surface and covered with a locked waterproof cap. <br /> Capable of meeting S,J. Co. PHS-EHD Well Standards, <br /> Leak interception and detection system shaLL prevent the Leaked hazardous substance from <br /> entering ground water. <br /> 14. INTERSTITIAL SPACE MONITORING <br /> Krp� A. Visual monitoring [Section 2632 (c) (1)] <br /> (a) Exterior surface and floor beneath tank monitored by direct viewing <br /> (b) Daily visual inspections <br /> (c) Liquid level in tank to be recorded at time of inspection <br /> (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br /> has occurred. <br /> B. Mechanical or electronic monitoring (Section 2632 (c) (2)] <br /> (a) Continuous monitoring system connected to an audible and visual alarm system. <br /> Monitoring equipment to be installed <br /> Manufacturer:�[���Z©per <br /> Model Number: "rLS 350 <br /> L Sensor Type: Vapor V/ Liquid ` Both. <br /> -40—e Sensor/Panel specifications. <br /> -44 Location(s) for sensors: <br /> Tank: A%M-jL-Aj?, Piping: 3uMj> <br /> Dispenser: 'FAN <br /> C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)). <br /> 15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or <br /> double-wall LIST. [Section 2631 (b)] <br /> N/p, A. Approved by a nationally recognized independent testing organization. <br /> B. Demonstration of integrity with the primary and/or secondary containment. <br /> 6 <br />