Laserfiche WebLink
12. Division 11 - Section 11140, Fuel Dispensing Systems, Page 11140-7, Paragraph 2.14., Vapor Return <br /> Adaptor Fitting: B. Acceptable Manufacturers: 1. DELETE "OPW 1611 AV or equal Emco Wheaton.". <br /> REPLACE with '-Bravo Model B-76B -or- approved equal. ' <br /> 13. Division 11 - Section 11140, Fuel Dispensing Systems, Page 11140-7, Paragraph 2.15., Vent Caps, B. <br /> DELETE entire sentence. REPLACE with "Pressure-Vacuum Vent Cap shall be T'"Husky Model 4620 or <br /> approved equal,'. <br /> 14. Division 11 - Section 11140, Fuel Dispensing Systems, Page 11140-8, Paragraph 2.19., Underground Oil <br /> Storage Tank Fuel Level Detection System 1, DELETE the word "Oil". REPLACE with "Petroleum". <br /> 15. Division 11 - Section 11140, Fuel Dispensing Systems, Page 11140-11, Following Paragraph 2.20.M.1, ADD <br /> Paragraph 2.24. Drop Tube Tank Bottom Shield; Install one per each tank's fill drop tube. Use <br /> TMUniversal Model 1101-40 -or- aporQged equal,'. <br /> 18. Drawing 7034734 (F-1), Demolition Site Plan: Mark all underground vent pipes (items 5 and 6) for removal. <br /> 17. Drawing 7034734 (F-1), Demolition Plan Notes: DELETE Note No.'s 5 and 6. REPLACE with the following: <br /> "6. Remove and replace all four(4) underground fiberglass vent pipes with new. Install new CARB- <br /> approved pressuretvacuum vent cover on primary gasoline tank's vent riser. 6. Back fill and install <br /> new asphalt concrete pavement over new underground vent piping." <br /> 18. Drawing 7034734 (F-2), New Fueling Site Plan: DELETE "(N) 2"Vapor Return" (piping). REPLACE with <br /> "(N) 34nch inside-diameter Vapor Return Piping with 4-Inch Secondary Containment Piping.". <br /> 19. Drawing 7034734 (F-2), New Fueling Site Plan: ADD new underground vent pipes and risers for each <br /> tank's annular space. Run parallel and adjacent to primary tanks' vent piping that Is shown. <br /> 20. Drawing 7034734 (F-2), New Fueling Site Pian: DELETE the two `Alternate Bid" Site Plans Details. <br /> 21. Drawing 7034734 (F-3), Mechanical Tank Sections, Underground Fuel Storage Tank-Section: ADD "Tank <br /> Bottom Shield"to tank fill drop tube. <br /> 22. Drawing 7034734 (F-4), Fueling Details, Detail 3 - Fill/Overfill Containment: ADD 'Tank Bottom Shield"to <br /> tank fill drop tutee. <br /> 23. Drawing 7034734 (F-4), Fueling Details, Detail 3 - Fill/Overfill Containment: ADD: 'GARB-approved Swivel <br /> . ."to ' Fill connector adapter". <br /> 24. Drawing 7034734 (F-4), Fueling Details, Detail 3 - Fill/Overfill Containment:: DELETE ' 6 inches or per <br /> manufacturer's requirements". REPLACE with 'Greater than 3 Inches, Less than 6 Inches". <br /> 25. Drawing 7034734 (E-1), Electrical Site Plan: DELETE "Alternate Bid" partial plan. <br /> 26_ Drawing 7034734 (E-1), Electrical Site Plan: DELETE all references to "intercept (existing) condud(s) . .". <br /> REPLACE with `Replace all (existing) conduit(s) . . .". <br /> 27. Drawing 7034734 (E-1), Electrical Site Plan, Panel Wall Elevation: DELETE "Alternate Bid"detail. <br /> 28. Proposal Form (found in the back of the specification): Item 2. (Option 1): DELETE "(extending the new TLS- <br /> 350 monitoring system to Include leak monitoring for the existing underground waste oil and hydraulic oil <br /> storage tanks)". REPLACE with " (furnish and install a second-Benneff model 3924 dual hose diesel dispenser <br /> complete with pulser, all electrical and piping, containment sump, and electronic monitoring)". <br /> PAGE 2OF3 <br />