Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> b. -Aping Hauler: <br /> Name <br /> Address eO�9 140- 1-114104 Zip Z,�� <br /> Phone No.( 2—q ) q 6q— <br /> Hauler Registration#(if hauled as hazardous) N�► g <br /> c. `I /Piping Disposal Site: <br /> Name Z>1-_-_P cS rrv--- <br /> Address i4--�� 1_� _ { � City Zip <br /> Phone No.(Zoe( ) e-? ?r --05-7 9 0 <br /> EPA ID#(if transported to a permitted TO facility) 41;a <br /> 9. Is the sampling firm an independent third party from the contractor? YES E•11NO I) <br /> 9a. Describe,in detail,how the soil and/or water sample(s)beneath the piping will be obtained: <br /> ary- <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> CLEAM i �}1�L � �5E11 AS 'FILL . <br /> 11. Handling of excavated sail: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> PLhs-ne- SAeF—D KIC= <br /> b)What will be the final destination of the excavated stockpile? <br /> 1Feo1.1TAcMIMACMD, Se)I- %-%%%L 3E hSt4L ZM3 Cr,E. ICAL- WA4S'tE ,1kic <br /> K-E'�i,�€�t,► , - <br /> c)Contaminated Soil Hazardous Waste Hauler: CITY CA, <br /> Name Hauler Registration# c-4,p O,-_ZS :1I <br /> Address PA. gnY 15_Q _ City -S"A'A4 Mm?--ntit Zip 9504G <br /> Phone No.( &5) &' B 3--23�S <br /> EH 23 046(Revised 08113/99) Page 5 <br />